Similar Projects
Reported | 05/01/2020 12:00 AM |
Project Title | Barrineau Park Community Center/HVAC Replacement |
Physical Address | View project details and contacts |
City, State (County) | Molino, FL 32577 (Escambia County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | County Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 1. Remove the Air Handler Unit and the Condensing Unit. 2. Install new Goodman 2.5-ton 410A refrigerant HVAC Heat Pump with auxiliary heat, equipment. 3. Make any upgrades that are required to meet current building code. 4. Replace the Thermostat, add overflow condensate pan, add overflow condensate drain line, add safety switches to the condensate drains, flush current refrigerant lines and re-use, re-use thermostat wire. Re-connect the current ductwork. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |