Project Title | Design of the Southport 24" Force Main to Glades Booster Pump Station |
Physical Address | View project details and contacts |
City, State (County) | Port Saint Lucie, FL (Saint Lucie County) |
Category(s) | Professional Services |
Sub-Category(s) | Engineering |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | To address the necessary pipelines, construction will take place in two phases. The first phase will be a new 24” FM starting at Community Blvd. and continue along Discovery Way in the Riverlands Parcel C area of Port St. Lucie. That pipeline will be designed and constructed by OTHERS. The present project will involve the design and construction services for a new 24” FM starting with a connection to an existing 24” FM at the intersection of Darwin Blvd. and Port St. Lucie Blvd. From there the force main will be routed along a canal and proceed to Rosser Blvd. It will then be routed through residential areas until it connects to the 24” FM constructed by others in Phase 1 at Community Blvd. Engineering Services include preliminary design, final detailed design, permitting, bid phase and construction phase services for the Southport 24” Force Main to the Glades WWBPS. The proposed Phase II force main construction includes approximately 26,300 linear feet of 24-inch pipe with several horizontal directional bores under streets and canals. |
Details | |
Bidder's List | View project details and contacts |
Prospective Bidders | View project details and contacts |
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |