Last Updated | 07/01/2020 09:16 AM |
Project Title | 2 Bridge Replacements, BR Nos H-24-021 and H-24-027 (Concrete), Old Boston Turnpike (Route 62) Over the West Branch Ware River |
Physical Address | View project details and contacts |
City, State (County) | Hubbardston, MA 01452 (Worcester County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Bridge |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $2,327,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | "1.000","Ls","Schedule Of Operations - Fixed Price $12,000","100." "8.000","Hr","Control Of Invasive Plants Existing On Site","102.3" "8.000","Hr","Invasive Plant Management Strategy","102.33" "1.000","Ea","Individual Tree Protection","102.51" "1.000","Ea","Tree Removed - Diameter 24 Inches And Over","104." "2.000","Ea","Tree Removed (Excluding Stump) Diameter Under 24 Inches","105.40" "20.000","Cy","Supplemental Borrow For Native Material","105.45" "1.000","Ls","Demolition Of Bridge No. h-24-021 (1c2)","115.1" "1.000","Ls","Demolition Of Bridge No. h-24-027 (6qj)","115.2" "800.000","Cy","Earth Excavation","120." "80.000","Cy","Topsoil Excavated And Stacked","125." "985.000","Cy","Bridge Excavation","140." "60.000","Cy","Test Pit For Exploration","141.1" "5.000","Cy","Class b Trench Excavation","142." "580.000","Cy","Channel Excavation","143." "196.000","Cy","Class b Rock Excavation","144." "100.000","Cy","Ordinary Borrow","150." "520.000","Cy","Gravel Borrow","151." "330.000","Cy","Gravel Borrow For Backfilling Structures And Pipes","151.2" "10.000","Cy","Controlled Density Fill - Non-Excavatable","153.1" "130.000","Ton","Crushed Stone","156." "245.000","Ton","Crushed Stone For Bridge Foundations","156.1" "1250.000","Sy","Fine Grading And Compacting - Subgrade Area","170." "24.000","Ton","Disposal Of Treated Wood Products","184.1" "1.000","Ea","Standpipe - Removed And Reset","376.4" "180.000","Cy","Dense Graded Crushed Stone For Sub-Base","402." "510.000","Sy","Pavement Micro Milling","415.3" "1850.000","Lb","Calcium Chloride For Roadway Dust Control","440." "5.000","Mgl","Water For Roadway Dust Control","443." "175.000","Ton","Superpave Intermediate Course - 19.0 (Sic - 19.0)","450.32" "310.000","Ton","Superpave Base Course - 37.5 (Sbc - 37.5)","450.42" "191.000","Ton","Superpave Bridge Surface Course - 9.5 Polymer (Ssc-b - 9.5 - p)","450.601" "43.000","Ton","Superpave Bridge Protective Course - 9.5 (Spc-b - 9.5)","450.70" "230.000","Gal","Asphalt Emulsion For Tack Coat","452." "1100.000","Ft","Hma Joint Sealant","453." "5.000","Ton","Hot Mix Asphalt For Miscellaneous Work","472." "90.000","Ft","Granite Curb Type Va5 - Straight","505." "50.000","Ft","Granite Transition Curb For Wheelchair Ramps - Straight","509." "570.000","Ft","Guardrail, Tl-3 (Single Faced)","620.13" "1.000","Ea","Trailing Anchorage","627.1" "3.000","Ea","Guardrail Tangent End Treatment, Tl-3","627.83" "2.000","Ea","Transition To Nchrp 350 Guardrail","628.21" "8.000","Ea","Transition To Bridge Rail","628.24" "1250.000","Ft","Highway Guard Removed And Discarded","630.2" "800.000","Ft","Turtle Barrier - 36 Inch Chain Link Fence (Pipe Top Rail) (Line Post Option)","645.936" "16.000","Ea","36 Inch Chain Link Fence End Post","652.036" "450.000","Ft","Temporary Fence","657." "450.000","Ft","Temporary Fence Removed And Reset","657.5" "775.000","Sy","Geotextile Fabric For Permanent Erosion Control","698.4" "17.000","Mo","Engineers Field Office And Equipment (Type a)","740." "1.000","Ls","Mobilization","748." "420.000","Sy","Compost Topdressing","751.72" "60.000","Cy","Topsoil Rehandled And Spread","752." "1.000","Ls","Wood Turtle Protection Plan","754.3" "1.000","Ls","Wetland Mitigation Area","755.35" "20.000","Hr","Wetland Specialist","755.7" "1.000","Ls","Wetland Monitoring Reports","755.75" "500.000","Sy","Seeding - Low Upland All Native Mix - Full Sun","765.413" "1700.000","Ft","Coir Logs","767.71" "60.000","Sy","Composted Mulch For Rip Rap","767.77" "12.000","Sy","Composted Mulch Over Modified Rockfill","767.78" "1100.000","Ft","Pavement Milling Mulch Under Guard Rail","769." "22.000","Sf","Warning-Regulatory And Route Marker - Aluminum Panel (Type a)","832." "2.000","Ea","Sign Sup (n/Guide)+Rte Mkr w/1 Brkway Post Assembly - Steel","847.1" "80.000","Hr","Roadway Flagger","850.41" "500.000","Sf","Safety Signing For Traffic Management","852." "4.000","Ea","Portable Breakaway Barricade Type Iii","853.1" "64.000","Ft","Temporary Barrier (Tl-2)","853.2" "64.000","Ft","Temporary Barrier Removed And Reset","853.21" "2600.000","Ft","Temporary Paving Markings - 6 Inch (Painted)","854.016" "2400.000","Day","Reflectorized Drum","859." "2100.000","Ft","6 Inch Reflectorized White Line (Polyurea) (Recessed)","866.206" "2100.000","Ft","6 Inch Reflectorized Yellow Line (Polyurea) (Recessed)","867.206" "5.000","Ea","Traffic Sign Removed And Discarded","874.41" "7.000","Cy","4000 Psi, 1.5 Inch, 565 Cement Concrete For Post Foundation","901.3" "41200.000","Lb","Steel Sheeting","952." "450.000","Sy","Excavation Support System Bridge No. h-24-021","953.3" "330.000","Sy","Excavation Support System Bridge No. h-24-027","953.4" "635.000","Ton","Riprap","983.1" "140.000","Cy","Streambed/Bank Restoration","983.521" "168.000","Ton","Modified Rockfill","986." "1.000","Ls","Control Of Water - Structure No. h-24-021","991.1" "1.000","Ls","Control Of Water - Structure No. h-24-027","991.2" "1.000","Ls","Bridge Structure, Bridge No. h-24-021 (c2l)","995.01" "1.000","Ls","Bridge Structure, Bridge No. h-24-027 (c2m)","995.02" "1200.000","Sy","Turtle Barrier (Modular Block)","998.001" |
||||||||||||||||||||
Details |
|
||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||