Similar Projects
New Consolidated Primary School
New Construction
Conception
Keyser, WV

Meadows Elementary School Construction
New Construction
Conception
Huntington, WV

New Spencer Middle School
New Construction - 56,300 SF
Design
Spencer, WV

Milton Middle School Construction
New Construction
Design
Huntington, WV

New Stratton Elementary School
New Construction - 58,785 SF
Post-Bid
Beckley, WV 25801

Storage Buildings
New Construction
Post-Bid
New Cumberland, Weirton, WV 26047

Pleasants County Middle School Natatorium Improvements
Results
Belmont, WV 26134

Washington Lands Elementary School Safe School Renovations
Renovation
Results
Moundsville, WV 26041

Orchard View Intermediate School Classroom Addition
Addition - 9,156 SF
Construction
Martinsburg, WV 25403

Orchard View Intermediate School Classroom Addition
Addition - 9,156 SF
Construction
Martinsburg, WV 25403

2022 Bond Construction & Renovation Projects
New Construction, Renovation
Pending Verification
Martinsburg, WV

2022 Bond Construction & Renovation Projects
New Construction, Renovation
Pending Verification
Martinsburg, WV

Davis Creek Elementary School Construction
New Construction
Conception
Huntington, WV

Shepherdstown Elementary School Construction
New Construction
Design
Shepherdstown, WV

East Dale Elementary School Renovations
Renovation
Post-Bid
Fairmont, WV 26554

Last Updated 03/04/2022 10:56 AM
Project Title

Additions and Renovations to Richwood Middle School, Richwood High School, and Cherry River Elementary School

Physical Address View project details and contacts
City, State (County) Richwood, WV 26261   (Nicholas County)
Category(s) Education
Sub-Category(s) Elementary School, Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Renovation and additions to a one-story school facility housing elementary, middle, and high schools whose construction features the following: Concrete foundations including drilled piers where indicated. Renovated and new concrete slab on grade floors. Perimeter walls constructed of insulated cavity masonry walls with face brick, adhered stone veneers, and metal cladding over metal furring. Interior partition walls constructed of painted CMU and painted gypsum board over metal framing. Suspended acoustical panel ceilings and exposed wood ceilings. Single-ply membrane roofing and standing seam metal roofing over roof insulation over steel roof decking supported on steel joist framing. Aluminum storefront-framed openings and entrances. Flush wood doors and steel doors in steel door frames. Glazed interior and exterior aluminum curtain walls. Interior finishes as indicated. Plumbing, mechanical, fire-protection, and electrical work.

Details

,, 108,471 SF - Middle/Senior High School, 67,264 SF Addition, Elementary School, 41,207 SF Renovation.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Signage.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 32 - Exterior Improvements.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents