Similar Projects
Slate Valley Walking Trail
New Construction - 3,600 SF
Design
Less than $15,000 est. value
Poultney, VT 05764

Greenway Rehabilitation Phase 3B South Construction
Bidding
$750,000 to $1,000,000 est. value
Burlington, VT 05401

Concrete Sidewalk Replacement Project
Infrastructure
Bidding
Middlebury, VT

Slip Formed Concrete Curbing 2020
Post-Bid
Rutland, VT

STP CVRT(2) - Winooski River Bridge and Bike Path Construction
Post-Bid
Montpelier, VT

West Rutland Sidewalk Segments STP BP15(1)
Results
$500,000 to $1,000,000 est. value
West Rutland, VT 05777

Kocher Drive - STP Sidewalk (12) and STP BP18(014)
Results
$500,000 to $1,000,000 est. value
Bennington, VT 05201

Conant Square Park & Ride
Infrastructure
Bidding
$92,000 est. value
Brandon, VT 05733

IQ004 Indefinite Delivery / Indefinite Quantity Primary Contracts -Contractor On-Ramp
Post-Bid
Montpelier, VT 05633

East Montpelier STP BIKE (63)
Results
$500,000 to $1,000,000 est. value
East Montpelier, VT 05651

2021 Sidewalk Replacement Project
Infrastructure
Bidding
Bristol, VT

Sidewalk to Missisquoi Valley Union High School Swanton STP BP19(5)
Post-Bid
Swanton, VT

Mt. Philo Summit Trail Reconstruction
Results
Charlotte, VT

Lyndon Town School Sidewalks
Post-Bid
Lyndonville, VT 05851

Fair Haven Rest Area Sidewalk Replacement
Results
$24,345 est. value
Fair Haven, VT

Last Updated 05/18/2021 08:17 AM
Project Title

Waterville Elementary School Parking Lot Resurfacing

Physical Address View project details and contacts
City, State (County) Waterville, VT 05492   (Lamoille County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Resurfacing of the main driveway, bus loop, parking areas and access drive in the back of the building, approximately 45,000 square feet. Bid includes 2 add alternates. Alternate one will be the addition of paving the gravel parking lot to the right as you drive in, approximately 8,600 square feet. Alternate two is the addition of a 40' x 65' paved sports court located by the playground.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents