Similar Projects
BioCentury Research Farm - Site Drainage Improvements
Infrastructure
Post-Bid
$152,900 CJ est. value
Boone, IA 50036

BioCentury Research Farm - Site Drainage Improvements
Infrastructure
Post-Bid
$152,900 CJ est. value
Boone, IA 50036

PCC Pavement - New
Infrastructure
Results
IA

HMA Resurfacing with Milling
Infrastructure
Results
IA

PCC Patching
Infrastructure
Results

South Main Street Water Main Replacement
Infrastructure
Results
$375,000 est. value
Boone, IA 50036

Granular Surfacing of Roadway
Infrastructure
Results

2022 Road Program
Infrastructure
Results
$289,643 CJ est. value
Boone, IA 50036

Iowa 17- HMA Joint and Crack Sealing
Infrastructure
Results
$20,000 to $40,000 est. value
IA

Reconstruct Runway 15/33 South 1,800'
Infrastructure
Results
$1,389,827 CJ est. value
Boone, IA 50036

HMA Resurfacing
Infrastructure
Results
$500,000 to $750,000 est. value
Boone, IA

Boone Hancock Drive Extension
Infrastructure
Results
$2,703,589 CJ est. value
Boone, IA 50036

Last Updated 11/09/2022 11:04 PM
Project Title

North 1st Street Storm and Sanitary Improvements

Physical Address View project details and contacts
City, State (County) Ogden, IA 50212   (Boone County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $162,105 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The extent of work involved includes furnishing labor, equipment, and new materials for construction of the Improvements. The Project includes the following Work: The project generally includes the installation of approximately 670 LF of 8-inch subdrain, 9 cleanout intakes, 356 LF of trench 8-inch gravity sanitary Sewer, sanitary service reconnections, 1 Sanitary Manhole, 602 SY of pavement removal, 1 bid alternate for replacing 602 SY of 6-inch HMA pavement, and other associated work. The method of construction shall be by contract in accordance with the Bidding Requirements and Contract Documents for said improvements approved by the City of Ogden.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents