Similar Projects
OR DOT 140(1), Klamath County Boat Marina to Lakeshore Drive
Infrastructure, Alteration
Design
$20,000,000 est. value
Klamath Falls, OR 97601

Swan Lake Energy Storage
New Construction, Infrastructure
Design
$800,000,000 CJ est. value
Pine Grove, OR 97603

2023 Drainage Canal Maintenance Construction Services
Infrastructure
Bidding
$680,000 CJ est. value
Klamath Falls, OR 97601

Klamath Hatchery - New Hatchery Building
New Construction, Infrastructure
Bidding
$5,000,000 CJ est. value
Chiloquin, OR 97624

Runway 8/26 Reconstruction, Crater Lake - Klamath Regional Airport
Alteration
Post-Bid
$8,500,000 est. value
Klamath Falls, OR

Spring Street Sewer Treatment Plant - 3B GMP
Renovation, Infrastructure
Post-Bid
$6,000,000 CJ est. value
Klamath Falls, OR 97601

US97 Barkley Springs Bridge Paving
Infrastructure
Results
$3,000,000 est. value
Chemult, OR 97731

MP191.0 - 192.6 Paving Project
Infrastructure
Results
$125,000 est. value
Klamath Falls, OR

Klamath County Fairgrounds 48 Space RV Park
Infrastructure, Build-out
Construction
$2,669,158 CJ est. value
Klamath Falls, OR 97603

Klamath County Fairgrounds 48 Space RV Park
Infrastructure, Build-out
Construction
$2,669,158 CJ est. value
Klamath Falls, OR 97603

Oregon Department of Human Services Building at TimberMill Shores
New Construction, Infrastructure - 92,000 SF
Pending Verification
$30,000,000 CJ est. value
Klamath Falls, OR 97601

Oregon Department of Human Services Building at TimberMill Shores
New Construction, Infrastructure - 92,000 SF
Pending Verification
$30,000,000 CJ est. value
Klamath Falls, OR 97601

OC&E State Trail
Infrastructure, Renovation
Design
$1,052,343 CJ est. value
Beatty, OR 97621

RFP Construction Manager - F-15 Static Display and Plaza
Infrastructure
Post-Bid
$500,000 CJ est. value
Klamath Falls, OR 97601

Central Parking Lot Rebuild
Infrastructure
Results
$381,560 CJ est. value
Klamath Falls, OR 97601

Last Updated 12/13/2023 07:08 AM
Project Title

Moore Park Parking Lot Rehabilitation

Physical Address View project details and contacts
City, State (County) Klamath Falls, OR 97601   (Klamath County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected February 2024
Bids Due View project details and contacts
Estimated Value $480,000 [brand] Estimate
Plans Available from Agency's Affiliate - 12/12/23
Owner View project details and contacts
Architect View project details and contacts
Description

If in the judgement of the Engineer, additional information or interpretation is necessary such information will be supplied in the form of an Addendum only plan holders who are listed on the City's plan holders list will be notified by email of the Addendum. Award of Contract will not be final until the later of: 1) City Council Contract Award, or 2) the City of Klamath Falls provides a written response to each timely protest, denying the protest and affirming the Award. On all Projects, Work performed by the Contractor's own organization must be at least 30% of the awarded Contract Amount. All questions regarding the Plans and Specifications must be submitted to Andrew Lakey, P.E., in written form through email at alakey@klamathfalls.city, on or before 12:00 P.M. 1/12/2024 by registered plan holders only Engineers Estimate Range: $460,000 to $480,000 Moore Park Parking Lot Rehabilitation: Work shall include, but not necessarily be limited to: Temporary Work Zone Traffic Control, Erosion Control, Clearing and Grubbing, Tree Removal, General Excavation, Grading, Aggregate Base, Curb Installation, Asphalt Paving, Pavement Markings, Sign Installation Bidders must identify whether they are a Resident Bidder as defined in ORS 279A.120 (Preference for Oregon goods and services). The City of Klamath Falls may not receive or consider a Bid for a public improvement Contract unless the Bidder is licensed by the Oregon Construction Contractors Board. Contractors or Subcontractors working with asbestos cement Materials must be licensed according to ORS 468A.720 (Qualifications for license) The City of Klamath Falls may reject any Bid that does not comply with prescribed public contracting procedures and requirements, including the requirement to demonstrate the Bidder's responsibility under ORS 279C.375 (Award and execution of Contract) (3)(b), and that the contracting agency may reject for good cause all Bids after finding that doing so is in the public interest The Project will be a public improvement Project subject to ORS 279C.800 to 279C.870, Prevailing Wage Rates. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents