Similar Projects
Wacker and Oakton Lift Station Upgrades
Renovation
Design
Savanna, IL

Reed's Creek Storm Water Pump Station
Renovation
Bidding
Carbondale, IL

Menominee Lift Station Rehabilitation
Renovation
Bidding
Palos Heights, IL

Levee 37 Pump Station Upgrade (USACE Acquisition)
Post-Bid
$1,000,000 to $5,000,000 est. value
Mount Prospect, IL

Low Lift Pump
Post-Bid
Winnetka, IL

Westside Wastewater Treatment Plant Influent Lift Station Improvements - Phase III Pump Replacement
Results
Joliet, IL 60436

US 41 at Deerpath Rd-PS38. New Pump Station 38 in the Sw Quadrant of Deerpath Rd
Results
IL

7th Avenue Pump Station
Construction
Less than $1,250,000 est. value
Mendota, IL 61342

Hennings Subdivision Completion of Infrastructure Contract A Manholes, Lift Station, and Wastewater Treatment Plant
Renovation, Infrastructure
Bidding
Huntley, IL

Mount Prospect Golf Club Irrigation Pump Station Replacement
Post-Bid
Mount Prospect, IL 60056

Construction of Lakeside Estates Pump Station and Force Main
Results
Mascoutah, IL 62258

Cedar Lake Road Pumping Station Remodel
Renovation
Bidding
Round Lake, IL

Check Valve Replacement
Renovation
Post-Bid
Gurnee, IL 60031

Sewer Rehab of Bode Lift Station
Results
Schaumburg, IL 60193

111th Street Pumping Station
New Construction
Bidding
Naperville, IL 60564

Last Updated 02/04/2022 01:53 PM
Project Title

Lift Station No. 16 Improvements

Physical Address View project details and contacts
City, State (County) Crystal Lake, IL 60014   (McHenry County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes, but is not limited to the following: a. Removal of Existing Lift Station Equipment b. New Self-Priming Pumps c. New Piping and Valves d. New Electrical Power Distribution Equipment e. Relocate Existing SCADA Components to New Enclosure f. Temporary By-Pass Pumping (By-Pass Portal Construction Only), Dewatering and Erosion Control g. Traffic Control h. New Site Improvements i. New Sacrificial Anodes j. New Generator and Controls k. Recoating of Existing Dry Well and Wet Well l. Site Restoration

Details

Lift and Pump Stations, New Construction.
Division 02 - Existing Conditions.
Division 03 - Concrete.
Division 05 - Metals.
Division 09 - Finishes.
Division 11 - Equipment.
Division 13 - Special Construction.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents