Similar Projects
5th Street & Life Science Center Tunnels Water Main Replacement
Infrastructure
Design
$29,626,148 est. value
Columbia, MO

General Site East Campus Utility Improvements
Infrastructure
Design
Columbia, MO

2021 Waterline Replacements - 3rd Street Waterline Relocation
Infrastructure
Bidding
Clinton, MO

Tomahawk Lane, Hawthrone Drive, Vosholl Avenue Water Main Improvements
Infrastructure
Bidding
Warrenton, MO 63383

Valve Testing and Repairs
Term Contract
Post-Bid
Columbia, MO

Butterfly Valves and Flanges
Post-Bid
Saint Louis, MO

Water System Improvements
Results
Milan, MO

Water Storage Tank Maintenance and Lindenwood New Tank Interior Renovation
Results
Saint Charles, MO

Electrical and Waterline Installation
Term Contract
Design
$250,000 to $500,000 est. value
Saint Charles, MO 65355

Water Main Replacement
Infrastructure
Bidding
Kansas City, MO 64155

Highway Department Maintenance Facility - Phase 2
Post-Bid
Carthage, MO

2021 Water System Improvements
Results
Jefferson City, MO

Replace Water Mains in 5th Street and Life Science Center Tunnels
Infrastructure
Bidding
$375,000 to $416,700 est. value
Columbia, MO

Repair Kits and Knife Gate Valve
Post-Bid
Saint Louis, MO

Water Main Replacement in the Area of Booth Avenue to Willow Avenue, East 28th Terrace to East 50th Street
Results
Kansas City, MO 64129

Last Updated 03/29/2022 10:32 AM
Project Title

Water Distribution, Supply, and Storage Improvements

Physical Address View project details and contacts
City, State (County) Urbana, MO   (Dallas County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents