Similar Projects
Orange County Force Main South Area Package 1
Infrastructure
Bidding
$2,946,309 est. value
FL

LS 57 SW Quad Gravity Sewer Rehabilitation Project
Post-Bid
$3,055,000 est. value
Orlando, FL

Corrections Genesis Sanitary Pipe Replacement
Infrastructure
Post-Bid
$1,800,000 est. value
Orlando, FL 32839

Wastewater Contract Services
Term Contract
Results
Less than $2,000,000 est. value
Orlando, FL 32816

Orange County Gravity Replacement Package 29
Results
Less than $995,285 est. value
Orlando, FL 32801

Sanitary Sewer Lining and Manhole Rehabilitation
Infrastructure
Post-Bid
$5,000,000 est. value
Orlando, FL

Utilities Gravity Replacement Package 3
Results
Less than $2,882,842 est. value
Orlando, FL 32818

Utilities Gravity Replacement Package 3
Infrastructure
Post-Bid
FL

Utilities Force Main East Package 1
Results
Less than $1,041,526 est. value
FL

Utilities Gravity System Improvements Package 30
Results
Less than $1,201,895 est. value
FL

Utilities SCADA Panel Replacement Package 1
Results
$2,492,797 est. value
Orlando, FL

Wifia Ls 42-P, Ls 43-P, Ls 44-P, Ls 45-P, Ls 46-P, Ls 47-P, And Ls 54-P Gravity Sewer Rehabilitation
Results
Less than $5,994,747 est. value
Orlando, FL 32800

Wekiwa Springs Septic Tank Retrofit Project Phase 1
Results
$8,422,953 est. value
FL

Poitras East Master Infrastructure Phase 1D and Off-Site Force Main
Results
Winter Park, FL 32789

Hull Avenue Septic to Sewer
Results
Oakland, FL 34760

Last Updated 04/29/2022 10:57 AM
Project Title

Cured-In-Place Lateral Lining Term Contract

Physical Address View project details and contacts
City, State (County) FL   (Orange County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of furnishing all labor, equipment and materials for the construction of cast-in-place pipe (CIPP) liners. Work covered by this contract includes, but is not limited to, cleaning and televising sewer mains and laterals, installation of CIPP liner systems in sanitary sewer laterals (either full length or sectional) ranging in size from 4” to 6”, installation of sectional CIPP liner systems in sanitary sewer mains ranging in size from 6” to 30”, rehabilitation and reconnection of existing service laterals, and CCTV inspection before and after rehabilitation work. Work includes all associated site work and restoration.

Details

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents