Reported 10/01/2020 12:00 AM
Project Title

Trails Landscaping Improvements

Physical Address View project details and contacts
City, State (County) Granite City, IL 62040   (Madison County)
Category(s) Heavy and Highway
Sub-Category(s) Landscaping
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of planting trees, bushes and flowers, mulch application, the building of berms and other work necessary to complete the improvements as specified. PHASE ONE: Work to be completed by December 31, 2020 Location 1. MCT Schoolhouse Trail in Collinsville (Between IL-157 and I-255) Plant 100 trees on the north side of the MCT Schoolhouse Trail in Collinsville, parallel to Horseshoe Lake Road between IL-157 and I-255. (spaced a minimum of 30 feeet apart, varieties interspersed). Trees include the following: 30 October Glory 3"C 30 Red Sunset Maple 3"C 40 American Hornbeam 2.5"C Location 2. MCT Nicel Plate Trail (Plum Street in Edwardsville) A. Plant trees in open area between MCT Trail and Plum Street Plant 37 Yoshino Cherry 2.5"C (spread evenly throughout the parcel to maximize spring color) B. Landscape the wedge-shaped triangular area between the MCT Trails Construct berm from topsoil and cover with 3" of mulch Plant 5 Burkii Red Cedar 6' H Plant 5 Rose of Sharon 6-7' H Plant 1 Forrest Pansy Redbud 2.5" C Plant 50 Black Eyed Susans and 50 Cone Flowers Location 3. MCT Nature Trail (Victory Drive and Garden Lane in Granite City) Plant 15 Redbud 2.5"C Plant 15 Dogwood 6' H Located north of the trail Location 4. MCT Goshen Trail (Troy Junction) Plant a series of trees in the triangular shaped open area where the MCT Goshen Trail meets the MCT Schoolhouse Trail in Troy Plant 10 Yoshino Cherry 2.5"C Plant 10 Kousa Dogwood 6' H Plant 10 Redbud 2"C Plant 10 October Glory Maple 2.5"C Plant 10 Autumn Blaze Maple 2.5"C PHASE TWO: Work to be completed by April 2, 2021 Location 1. MCT Schoolhouse Trail in Collinsville (Between IL-157 and I-255) Build 1 berm 75' x 25' x 3' on MCT property north of the MCT Schoolhouse Trail, across from the I-255 intersection with Horseshoe Lake Road. Construct berm from topsoil A minimum 3" of mulch applied to top of berm. Plant 10 Burning Bushes 3'H Plant 5 Moonglow Magnolia 6'H Plant 25 Daylilies of various colors Location 2. MCT Nickel Plate Trail (Plum Street in Edwardsville) Build 3 berms 50'x8'x3' each along Plum Street and split the following equally across the three berms: Construct berms from topsoil A minimum of 3" mulch applied to top of each berm Plant 99 Black eyed Susans Plant 99 Cone Flowers Plant 15 Allegheny Serviceberry Clump 6' H Plant 18 Burning Bush 24" to 30" Location 3. MCT Nature Trail (Victory Drive and Garden Lane in Granite City) No Phase 2 Work Location 4. MCT Goshen Trail (Troy Junction) Build 1 berm 40'x8'x3' Construct berm from topsoil A minimum 3" of mulch applied to top of berm. Plant 3 Allegheny Serviceberry Clump 6' H Plant 4 Burning Bush 24"-30" H Plant 25 Black Eyed Susans Plant 25 Cone Flowers

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents