Similar Projects
Silver Lake Trail
Infrastructure
Bidding
$1,320,665 est. value
Everett, WA 98208

ADA Ramps Project
Infrastructure
Bidding
$285,000 to $315,000 est. value
Lynnwood, WA 98037

8th Street Improvements Project
Alteration
Post-Bid
$739,767 est. value
Marysville, WA

8th Street Improvements Project
Alteration
Post-Bid
$739,767 est. value
Marysville, WA

Nugget Park Sidewalk Replacement
Infrastructure
Results
$275,000 to $350,000 est. value
Brier, WA 98036

Harbour Reach Drive Improvements
Infrastructure
Results
$915,224 est. value
Mukilteo, WA 98275

E Sunset Way Vic and NB Lowell Rd Vic PCCP Exp Jnt Rehab & Deck Overlay
Renovation, Infrastructure
Bidding
$12,500,000 est. value
Issaquah, WA

2022 Street Overlay and ADA Ramps
Infrastructure
Post-Bid
$360,000 to $440,000 est. value
Stanwood, WA 98292

Fisherman's Harbor Commercial Development Parcels A8 & A17
New Construction, Infrastructure, Alteration - 6,000 SF
Results
$4,300,000 to $4,700,000 est. value
Everett, WA 98213

SR 96, North Creek Fish Passage
Infrastructure
Bidding
$2,500,000 to $3,000,000 est. value
Mill Creek, WA 98082

Airport Parking Lot Access Modification
Term Contract
Post-Bid
WA

172nd Street NE & 40th Avenue Signal and Median Improvements
Infrastructure, Alteration
Results
$1,846,000 est. value
Arlington, WA 98223

Interurban Trail to YMCA Pedestrian Improvements
Infrastructure
Bidding
$290,691 est. value
Everett, WA

HASCO Properties - Asphalt Sealcoat, Stripe, and Miscellaneous Repairs
Infrastructure
Post-Bid
$3,000,000 est. value
Everett, Lake Stevens, Lynnwood, Marysville, Mountlake Terrace, Snohomish, WA 98043

Engineering Services for North Sound to Olympics (STO) Trail Planning Study
Infrastructure
Results
Less than $343,000 est. value

Reported 05/20/2022 12:00 AM
Project Title

Pavement Rehabilitation and Safety Improvements

Physical Address View project details and contacts
City, State (County) Tulalip Bay, WA   (Snohomish County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs), Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $700,000 [brand] Estimate
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Pavement Rehabilitation 2021 - Schedule A: 28th Drive NW project will include pavement rehabilitation ofthe existing streets, removal and replacement of existing curb and gutter. Hot Mix Asphalt (HMA) pavement, replacement of existing driveways, storm sewer improvements, installation of a water quality treatment device, underdrains, and Fire Hydrant resettleg. Schedule B: 81st Street NE project will include pavement rehabilitation of the existing streets, partial removal and replacement of existing curb and gutter. Hot Mix Asphalt (HMA) pavement, storm sewer improvements, installation of a water quality treatment and infiltration device, and illumination improvements. Schedule C: Totem Beach Road will include pavement rehabilitation of the existing streets, removal and replacement of existing curb and gutter, removal and replacement of existing sidewalk, Hot Mix Asphalt (HMA) pavement, HMA Overlay, replacement, of existing driveway entrances, storm sewer and bioswale improvements.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents