Similar Projects
Last Updated | 10/28/2020 09:54 AM |
Project Title | Willeo Road Over Willeo Creek Bridge Replacement |
Physical Address | View project details and contacts |
City, State (County) | GA (Cobb County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Bridge |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project includes a complete bridge replacement of the existing bridge located on Willeo Road over Willeo Creek. The project is located on Willeo Road, between Bywater Trail and Timber Ridge Road/Lower Roswell Road, at the Cobb/Fulton County line.Construction staging will require the closure of Willeo Road as shown on the plans for a maximum duration of 120 consecutive calendar days. Specific closure dates shall be dependent on Atlanta Gas Light’s (AGL) ability to isolate and take out of service the 12-inch steel gas main that is attached to the existing bridge, with a 120-day road closure required to occur between mid-March ad September 2021. Contractor shall coordinate closure with AGL. |
||||||||||||||||||||
Details |
|
||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |