Last Updated | 08/12/2022 12:35 PM |
Project Title | RFQ - Various Phase I Engineering and Environmental Services, Various Routes |
Physical Address | View project details and contacts |
City, State (County) | Ottawa, IL 61350 (La Salle County) |
Category(s) | Heavy and Highway, Professional Services |
Sub-Category(s) | Engineering, Maintenance |
Contracting Method | Competitive Bids |
Project Status | Construction start expected November 2022 |
Bids Due | View project details and contacts |
Estimated Value | $750,000 [brand] Estimate |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Job No. P-93-028-22, Various Phase I Engineering and Environmental Services, Various Routes, Various Counties, Region Two/District Three. This project requires 23% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on July 27, 2022, at 9:30 AM at the Region Two/District Three Office in Ottawa. Phase I engineering studies are required for various projects throughout District Three. Work orders under the blanket agreement will be negotiated and authorized by the department on an as-needed basis. Phase I engineering studies may consist of conducting route surveys, land surveys, geometric studies, environmental studies, preliminary plans, preparing project reports and reviewing geotechnical reports. This work may include data collection, development of alignment alternatives, cost estimates, transportation management analysis, crash analysis, drainage studies, and other related work and exhibits necessary to complete the Phase I preliminary engineering. Preparation of bridge condition reports and waterway hydraulic reports may be required. The estimated construction cost for these projects is anticipated to be in excess of $10,000,000. The estimated engineering fee for this project is $1,000,000. The completion date for this contract will be 60 months after authorization to proceed. The Prime firm must be prequalified in the following categories to be considered for this project: Location Design Studies (Rehabilitation) Statements of Interest, including resumes of the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). The firm acting as the prime must be prequalified in all the prequalification categories requested in the project advertisement even if they plan to subcontract part of the project, except where noted in a specific project advertisement. Any work being done by a consultant, prime or sub must be prequalified in the IDOT prequalification category of work they are performing. Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The method of contractor selection has not been determined at this time. IDOT - 029 - RFQ - Various Phase I Engineering and Environmental Services, Various Routes |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |