Similar Projects
Gaffin Road SE Improvements - 0000253 - City of Salem
Infrastructure
Conception
$2,900,000 CJ est. value
Salem, OR 97317

Gaffin Road SE Improvements - 0000253 - City of Salem
Infrastructure
Conception
$2,900,000 CJ est. value
Salem, OR 97317

AutoZone #2227 / Salem
New Construction, Infrastructure - 5,000 SF
Design
$1,500,000 CJ est. value
Salem, OR 97317

AutoZone #2227 / Salem
New Construction, Infrastructure - 5,000 SF
Design
$1,500,000 CJ est. value
Salem, OR 97317

Pringle Elementary School
Addition, Demolition, Alteration
Post-Bid
Salem, OR

2022 Silverton Overlay Project
Infrastructure
Post-Bid
Silverton, OR 97381

Silver Creek Raw Water Line Installation Project
Alteration
Results
$2,800,000 est. value
Silverton, OR 97381

Brass Corporation Bends
Term Contract
Results
Salem, OR

The Confederated Tribes of Siletz Indians Casino
New Construction, Infrastructure - 673,300 SF
Pending Verification
$280,000,000 CJ est. value
Salem, OR 97305

Del Taco / Salem
New Construction, Infrastructure - 2,400 SF
Pending Verification
$400,000 CJ est. value
Salem, OR 97305

West Salem Wastewater Pump Station Improvements - 0001063 - City of Salem
Renovation, Infrastructure
Conception
$22,510,140 CJ est. value
Salem, OR 97301

Hilfiker Lane SE at Commercial Street SE Intersection with Signal Upgrade - City of Salem
Infrastructure
Design
$4,448,690 CJ est. value
Salem, OR 97302

Fire Hydrants
Infrastructure
Post-Bid
Salem, OR

Brass Meter Adapters
Term Contract
Results
Salem, OR

Four Corners Elementary School Expansion and Improvements - 2018 Bond - Salem Keizer Public Schools
Addition, Build-out, Renovation, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Salem, OR 97317

Last Updated 04/17/2023 11:32 AM
Project Title

Water Improvements Pavement Repair

Physical Address View project details and contacts
City, State (County) Detroit, OR 97342   (Marion County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $159,700 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work under this Contract will include the supply and construction of trench patching at 2nd Street, 3rd Street, Lakecrest Drive, Lake Avenue, Scott Avenue, and Butte Street, as well as partial road reconstructions at 3rd Street and Front Street. Work in 2nd Street will include the supply and construction of approximately 640 LF of trench patch. Work in 3rd Street will include the supply and construction of approximately 530 LF of partial road reconstruction as well as 210 LF of trench patch. Work in Lakecrest Drive will include the supply and construction of approximately 800 LF of trench patch. Work in Front Street will include the supply and construction of approximately 950 LF of partial road reconstruction. Work in Butte Avenue will include the supply and construction of approximately 190 SF of trench patch. Work in Scott Avenue will include the supply and construction of approximately 380 SF of trench patch. Work in Lake Avenue will include the supply and construction of approximately 570 SF of trench patch. All work under this Contract must be substan14 Day, Checked WS, verified bd/t, pre bid meeting, no addenda, uploaded updated PHL, Completed 14 Day Assignment. tially completed within 90 calendar days of the Notice to Proceed not withstanding days allotted for inclement weather in accordance with paragraph 12.03.C of the General Conditions. Work in Lakecrest Drive will include the supply and construction of approximately 1000 LF of pavement overlay as well as 640 LF of trench patch. Work in Front Street will include the supply and construction of approximately 670 LF of pavement overlay as well as 940 LF of trench patch. Work in Forest Avenue will include the supply and construction of approximately 120 LF of pavement overlay. Work in "Northeast Neighborhood" will include the supply and construction of approximately 1050 LF of pavement overlay as well as 175 LF of trench patch. All interested parties are invited to attend. Subcontractor declarations must be submitted to the above-mentioned representative no later than 4:00 p.m. on the bid opening date stated above. Est. Value Notes: 150,000-250,000 Pre-Qualification: Yes Bids will be received as a combination of unit price and lump sum bid items. No bid will be considered unless fully completed in the manner provided in the Instruction to Bidders and accompanied by a bid security executed in favor of the Owner in the amount not less than 10% of the total bid amount of the bid. Bid security is to be forfeited as fixed and liquidated damage should the bidder neglect or refuse to enter into a contract and provide suitable insurance certificates, bond, or other required documents for the faithful performance of the work in the event bidder is awarded the contract. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents