Similar Projects
Site Development - East Side Terminal Area - 47732185 - City Of Lee Summit
New Construction, Infrastructure
Conception
$2,653,000 CJ est. value
Lees Summit, MO 64064

Field House - 47232784 - City of Lees Summit
New Construction, Infrastructure
Conception
$16,000,000 CJ est. value
Lees Summit, MO 64063

Buc-ee's / Springfield
New Construction, Infrastructure - 53,000 SF
Design
$28,000,000 CJ est. value
Springfield, MO 65803

Real Dill Pickleball Club At The District
New Construction, Infrastructure
Design
$5,000,000 CJ est. value
Chesterfield, MO 63005

Nursing Simulation Lab, Looney Hall, West Plains Campus
Addition, Demolition, New Construction, Infrastructure
Bidding
$2,600,000 CJ est. value
West Plains, MO 65775

Huzzah Creek Stabilization
Infrastructure
Bidding
$500,000 CJ est. value
Steelville, MO 65565

The Rail Apartments - Carpentry - Rough and Finish
New Construction, Infrastructure
Sub-Bidding
$200,000 CJ est. value
Saint Louis, MO 63110

The Rail Apartments - Painting - Interior and Exterior
New Construction, Infrastructure - 268 SF
Sub-Bidding
$300,000 CJ est. value
Saint Louis, MO 63110

Youth Ballfield Complex
New Construction
Post-Bid
$4,250,000 est. value
Cape Girardeau, MO

Preservation Square Phase 2A - Site Prep Package
Renovation
Post-Bid
Saint Louis, MO 63106

Sitework Services
Term Contract
Results
Columbia, MO

Jefferson City HS Athletic Improvements
Renovation
Results
Jefferson City, MO 65101

Ford Motor Company Stamping Plant / Liberty
Addition, Demolition, Infrastructure - 55,000 SF
Construction
$6,424,320 CJ est. value
Liberty, MO 64068

Indoor Athletic Complex
New Construction
Pending Verification
Saint Louis, MO

Lux Living South Kingshighway Boulevard Multi Residential
New Construction, Infrastructure
Pending Verification
$51,000,000 CJ est. value
Saint Louis, MO 63110

Last Updated 08/23/2022 09:01 PM
Project Title

The School District of Springfield R-12 New Launch/PD Facility

Physical Address View project details and contacts
City, State (County) Springfield, MO 65807   (Greene County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Athletic Facility, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The purpose of the commissioning process is to provide the owner with assurance that the mechanical, electrical, and control systems have been installed according to the contract documents and operate according to the performance guidelines set out in the design intent and these specifications. The CA will provide an unbiased and objective view of the systems installation, operation, and performance. This does not take away from the contractors responsibility to provide a finished product, installed and fully functional in accordance with the contract documents. The General Contractor, Mechanical Contractor, Electrical Contractor, and all Sub-Contractors shall be responsible for cooperating and coordinating their work with the CA. They shall be responsible for all physical activities required for installing the components and systems along with operating them during the commissioning process. For questions regarding the project, contact the Architect: Thom Lundberg with Esterly, Schneider & Associates, Inc, 1736 E Sunshine, Suite 417, Springfield, MO 65804, (417) 862-0558. For questions regarding the project, please post questions into Electronically. For general information please contact the Project Coordinator, David Roesener, 417-523- 0672.

Details

Division 01 - General Requirements, Construction Facilities.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings.
Division 09 - Finishes, Painting.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 31 - Earthwork, Site Clearing, Earth Moving.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Athletic and Recreational Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents