Similar Projects
Rozsa Center Lobby Flooring and Painting
Alteration
Bidding
Houghton, MI

Furnish and Install Floor System for Electrical Building Offices and Hallways
Alteration
Bidding
$300,000 est. value
Waterford Township, MI

Carpet at Ella Sharp Park Mini Golf Course
Post-Bid
Jackson, MI

Removal of Multiple Layers of Epoxy Flooring
Post-Bid
Detroit, MI 48207

Lap Pool Tile Baseboard and Windowsill Replacement
Results
Livonia, MI 48154

K.I. Sawyer Elementary School Flooring Abatement
Results
Gwinn, MI 49841

Non-Asbestos Floor Tile and Asbestos Floor Mastic Removal
Alteration
Bidding
$160,000 est. value
Saint Clair Shores, MI 48080

Remodel Existing Entry and Classroom Carpet
Post-Bid
Genesee, MI

Sterling Elementary Roofing Project
Results
Sterling, MI 48659

Dance Floors - Garden City Radcliff Center
Alteration
Bidding
$200,000 est. value
Garden City, MI 48135

2021 Hallway Carpeting Project
Post-Bid
Sterling Heights, MI

Flooring - Police and Fire Training Center
Alteration
Results
Troy, MI 48083

Concrete Floor Applications at DPS Garage and Spencer Beach House
Alteration
Bidding
Rochester Hills, MI

Kitchen Tile Repair at Mystic Creek Golf Course
Post-Bid
Milford, MI 48380

MBMV212806 – Repair Warehouse Floor – BLDG 6901
Term Contract
Results
$250,000 to $500,000 est. value
Battle Creek, MI

Reported 06/07/2022 12:00 AM
Project Title

Replace Bathroom Flooring in Rental Unit

Physical Address View project details and contacts
City, State (County) Harbor Springs, MI 49740   (Emmet County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

SCOPE A. The Contractor shall obtain the necessary equipment and supplies to accomplish the task of replacing bathroom floor in rental unit at 3602 Zhow Noong, Harbor Springs, Michigan. Equipment must be in working order to accomplish the contract obligations. LTBB to provide supplies. Call for appointment to see unit for specific room size. B. Work with LTBB housing Department to schedule access to unit and arrange progress inspections. C. Adhere to all Covid protocols and distancing guidelines to ensure safety and health of both Contractor's staff and LTBB Citizens. D. Supply flooring similar to existing and according to LTBB Housing Director's choice. E. Remove toilet and any other fixture necessary to access floors. Reinstall when complete. Install new wax seal for toilet. F. Contractor shall remove and replace all existing flooring in bathroom. G. Make subfloor repairs or replacement where needed. H. Reinstall trim, molding, and replace threshold as needed. I. Provide before and after photos of project. J. Supply all materials required for completion of this contract. K. Clean, remove, and dispose of all debris resulting from this project. L. Contractor shall be responsible to make any repairs in areas where Contractor's equipment damages said areas i.e. walls, doors, cabinets, etc. M. Project is subject to Davis Bacon and Related Acts (40 USC 276a; 29 CFR Parts 1, 3, 5, 6 and 7), and Certified Payroll Records must be submitted to LTBB during the project period see Section III-B and Addendum A for specifications, applicable if Contractor has employees and has an accumulative contract total exceeding $1,999.99.

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents