Similar Projects
WP-4 Reservoir and Associated Improvements
Infrastructure
Design
$200,000 CJ est. value
Omaha, NE 68102

WP-4 Reservoir and Associated Improvements
Infrastructure
Design
$200,000 CJ est. value
Omaha, NE 68102

Bluestem Meadows SID 605, Douglas County - Sanitary Sewer System - Section II
Infrastructure
Bidding
$112,750 CJ est. value
Omaha, NE 68102

Bluestem Meadows SID 605, Douglas County - Sanitary Sewer System - Section II
Infrastructure
Bidding
$112,750 CJ est. value
Omaha, NE 68102

District 2 On-Call Util Location Service
Term Contract, Infrastructure
Post-Bid
$5,000,000 est. value

District 2 On-Call Util Location Service
Term Contract, Infrastructure
Post-Bid
$5,000,000 est. value

Oakmont Drive Water Main Improvements
Infrastructure
Results
Plattsmouth, NE 68048

NP Dodge Park Waterline Replacement
Infrastructure
Results
Omaha, NE 68112

Costco Wholesale Off-Site Parking Lot / Omaha
Infrastructure - 153,409 SF
Construction
$200,000 CJ est. value
Omaha, NE 68154

Logan View Public Schools Elementary Addition
Addition, Demolition, Infrastructure
Construction
$2,219,000 CJ est. value
Hooper, NE 68031

Omaha Civic Auditorium Redevelopment
Infrastructure, Renovation
Pending Verification
$102,000,000 CJ est. value
Omaha, NE 68102

The Rows at Coventry
New Construction, Infrastructure
Pending Verification
$83,000,000 CJ est. value
Omaha, NE 68022

Ritz Lake - Phase II
New Construction, Infrastructure
Design
$5,000,000 CJ est. value
Fremont, NE 68025

BROOK PARK PAVING MAINTENANCE 2022
Infrastructure
Bidding
$99,632 CJ est. value
Omaha, NE 68102

District 5 On-Call Util Location Service
Term Contract, Infrastructure
Post-Bid
$5,000,000 est. value

Last Updated 09/27/2022 02:44 AM
Project Title

New Watermain HWY 30 to CR 26

Physical Address View project details and contacts
City, State (County) Blair, NE 68008   (Washington County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $137,275 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the following Work: Construction of a new water main along Berry Hill Road from US Highway 30 to County Road 26. A pre-bid conference will not be conducted for this Project.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents