Similar Projects
UPRR Parking Lot
Post-Bid
Cibolo, TX

Campus Sidewalk Project
Post-Bid
Gainesville, TX

New Sidewalk Construction
Results
$100,000 to $250,000 est. value
El Paso, TX 79906

Walnut Creek Elementary Pedestrian Walkway
Results
Azle, TX

Cade Branch Trail Project
Construction
Roanoke, TX

Constructing a Parking Lot Area
Post-Bid
Gainesville, TX 76240

Parking Lot - Castroville Building
Results
Hondo, TX

Northgrove Section 7 Sitework and Landscape
Post-Bid
TX

2019 Reclamation Reconstruction Task Order Contract Package 6
Results
San Antonio, TX 78205

Converse Sidewalk Project
Post-Bid
Less than $370,000 est. value
Converse, TX 78109

General Civil Construction and Related Items, Precinct 3
Term Contract
Results
$1,500,000 est. value
Houston, TX

Technology Bridge Side-Walk and Security Fence
Post-Bid
Houston, TX

FY19 Winter Parking Lot Maintenance Project
Results
Houston, TX

Curb Cutting
Term Contract
Post-Bid
San Marcos, TX

Repair and Install Ramps
Results
Houston, TX

Reported 08/22/2019 12:00 AM
Project Title

River Bend Pedestrian Improvements Phase III

Physical Address View project details and contacts
City, State (County) El Paso, TX   (El Paso County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $3,500,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description The work consists of pedestrian and bicycle improvements along River Bend Drive from Frontera Road to approximately 1,020 feet south of Sunset Road. The current conditions consist primarily of an unimproved parkway. The project is bounded by residential properties, Zach White Elementary School and Braden Aboud Memorial Park. El Paso County Water Improvement District #1 facilities cross the project via Lateral C at Roxbury Drive. An existing 3-72” CMP culvert crosses the project at the White Spur Drain between Turnstone Drive and Sunset Road and is maintained by El Paso Water. The proposed improvements will include an HMAC paved pedestrian path with a length of approximately 1.24 miles complete with new slotted curb, storm sewer, accent lighting, landscaping and an irrigation system. Accent lighting will be included via bollard lighting. Curb ramps will be provided at all intersecting streets.
Details
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents