Similar Projects
Intersection Improvement US 176 (State Rd)/S-135 (Mudville Rd)
Infrastructure
Conception
$2,100,000 CJ est. value
Ridgeville, SC 29472

Downtown Nexton Mixed-Use
New Construction, Infrastructure - 310,000 SF
Design
$100,000,000 CJ est. value
Summerville, SC 29483

SafeNest Storage
New Construction, Infrastructure - 113,400 SF
Design
$12,200,000 CJ est. value
Summerville, SC 29483

Parking Lot Striping at Cane Bay High School
Infrastructure
Bidding
$100,000 CJ est. value
Summerville, SC 29483

Harris Teeter Fuel Center #355 / Summerville
Demolition, New Construction, Infrastructure, Renovation
Post-Bid
$800,000 CJ est. value
Summerville, SC 29485

Proposed Mitigation Plans for SC-91 (Berlin Myers Parkway) Phase 3
Infrastructure
Post-Bid
$200,000 CJ est. value
Summerville, SC 29483

Navy Base Intermodal Facility Advanced Work Package project
Demolition, Infrastructure
Results

Limehouse Drive/Multi-Residential
New Construction, Infrastructure
Pending Verification
$18,000,000 CJ est. value
Summerville, SC 29485

Salisbury at North Maple - Phase 1
New Construction, Infrastructure - 5,000 SF
Pending Verification
$140,000,000 CJ est. value
Summerville, SC 29483

Rangewater North Maple Street
New Construction, Infrastructure
Design
$65,000,000 CJ est. value
Summerville, SC 29483

Rosenwald School Civil Project
Infrastructure
Post-Bid
Saint George, SC 29477

Summerville Preparatory Academy
New Construction, Infrastructure - 42,900 SF
Pending Verification
$8,400,000 CJ est. value
Summerville, SC 29485

Wastewater Treatment Plant Expansion and Improvements
Infrastructure
Post-Bid
$10,000,000 CJ est. value
Summerville, SC 29483

North Maple Street Mixed Use / Rosemary Tract
New Construction, Infrastructure
Pending Verification
$80,000,000 CJ est. value
Summerville, SC 29483

Sawmill Apartments
New Construction, Infrastructure
Pending Verification
$55,000,000 CJ est. value
Summerville, SC 29483

Last Updated 11/04/2022 03:07 PM
Project Title

AVA Martins Creek Townhomes

Physical Address View project details and contacts
City, State (County) Summerville, SC 29485   (Dorchester County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Multi-Family Homes, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $25,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of November 3, 2022, the final approval was recommended for approval by the Summerville Planning commission May of 2022; No building permits have been issued. Information regarding homebuilder, architect, or contractor has yet to be determined. Although a firm timeline has yet to be announced, construction is estimated to begin fourth quarter 2022. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents