Similar Projects
Roadway Resurfacing Milepost 0 to 122
Bidding

Hilltop Drive and Moore Street Road Improvements
Post-Bid
Stockton, NJ 08559

Roadway Improvement Project and Water Main Replacement Project
Post-Bid
Milford, NJ 08848

2018 Various Streets Paving
Results

Roadway Improvement Project for Highland Avenue and Elwood Avenue
Results
$480,917 est. value
Flemington, NJ 08822

Roadway Improvement Project for Case Boulevard
Post-Bid
Raritan Township, NJ 08822

Cokesbury Road Resurfacing and the 2019 Roadway Improvement Project
Results
$135,777 est. value
Lebanon, NJ

Resurfacing of Homestead Road
Post-Bid
Califon, NJ 07830

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Milford Road Improvement Project Sections III
Post-Bid
Frenchtown, NJ 08825

Main Street Improvements
Results
Califon, NJ 07830

Stanton Mountain Road Improvements Phase 2
Post-Bid
Lebanon, NJ 08833

Hunterdon County Routes 513 and 628
Results
$6,164,924 est. value
Flemington, Franklin, Glen Gardner, Lebanon, NJ 08822

Improvements to Sanford Road
Post-Bid
Sergeantsville, NJ 08557

Maintenance Roadway Contract C114, NJ 31 NB and SB
Results
$5,000,001 to $10,000,000 est. value
NJ

Reported 11/27/2019 12:00 AM
Project Title

Repaving of Wastewater Treatment Plant Area and Access Road

Physical Address View project details and contacts
City, State (County) Lambertville, NJ   (Hunterdon County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer - 10/29/19
Owner View project details and contacts
Architect View project details and contacts
Description

The work will include but is not limited to, milling and overlaying the access road to the Lambertville Municipal Utility Authority Plant and reconstruct asphalt areas. The contractor shall be responsible for providing all labor, supervision, trade skills, materials, and equipment required for this project as described in the Construct Documents. The Contractor will abide by conditions and requirements for the scope of work and all coordination with property owners before and after installation activities (if and where directed and required based on the sanitary lateral cured-in-place installations). Complementary work to furnish and install accessory materials as may be necessary may be if and where directed items by the Owner. The contractor shall be responsible for providing all labor, supervision, trade skills, materials, and equipment required for this project as described in the Construction Documents.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents