Similar Projects
Collection System Repairs Phase II
Infrastructure
Bidding
$7,040,000 CJ est. value
Canton, OH 44702

Collection System Repairs Phase II
Infrastructure
Bidding
$7,040,000 CJ est. value
Canton, OH 44702

Underground Civil and Infrastructure Improvements
Infrastructure
Post-Bid
Canton, OH

Fire Hydrant and Fire Hydrant Repair Parts
Term Contract
Post-Bid
Canton, OH

12th Street Northwest Water Main Replacement TAG 617
Results
$287,700 est. value
Canton, OH

Lead Water Service Replacement
Results
Alliance, OH

2022 City Paving Program Phase 2
Infrastructure
Bidding
$400,000 CJ est. value
Canton, OH 44702

Pipe and Pipe Fittings
Alteration
Post-Bid
Canton, OH

P-606 Waterline Improvements
Results
$948,639 est. value
OH

Harvard Avenue Waterline Replacement Project
Infrastructure
Post-Bid
$1,469,000 est. value
Canton, OH 44701

North Market Street Water Main
Term Contract
Results
$295,451 est. value
Minerva, OH

Market Ave North Waterline Replacement (TAG 584)
Infrastructure
Post-Bid
$1,599,000 est. value
Canton, OH 44714

Stevens Run Water Line Extension
Infrastructure
Results
Canton, OH

2022 Paving Projects
Infrastructure
Post-Bid
$125,000 CJ est. value
East Sparta, OH 44626

Edgefield Area Phase 2 Water Main Replacement - TAG 577
Infrastructure
Results
$1,930,240 est. value
Canton, OH

Last Updated 07/22/2022 06:31 PM
Project Title

Allen Avenue SE Area Sanitary Sewer and Waterline Project

Physical Address View project details and contacts
City, State (County) Canton, OH 44707   (Stark County)
Category(s) Heavy and Highway, Sewer and Water, Single Trades
Sub-Category(s) Plumbing, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $6,170,393 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Questions regarding plans and specifications should be addressed in writing to Purchasing Department, at purchasing@cantonohio.gov. All bids must include a Bid Guaranty, as described in the Instructions to Bidders. Prevailing wage rates apply. All bidders will be required to comply with the City Contract Compliance Program regarding equal employment opportunity. After submission and opening, no bidder may withdraw its bid within 60 days after the opening; the City reserves the right to waive irregularities, reject any or all bids, and conduct necessary investigations to determine bidder responsibility. This procurement is subject to the EPA policy of encouraging the participation of small business in rural areas (SBRAs). The successful bidder must comply with all Davis-Bacon Prevailing Wage Rates. There are two Plan Labor Agreements (PLA) for this project. All companies must submit their Federal ID Number. A Project Labor Agreement (PLA) is required for this project. The Engineer's Estimate for the base bid is $7,024,750. This project is contingent upon the City receiving funding Question Deadline: 7/7/2022 2:00 PM

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents