Similar Projects
309 Resurface - Ben Titus Road North
Infrastructure
Conception
$5,506,573 CJ est. value
Tamaqua, PA 18252

309 Resurface - Ben Titus Road North
Infrastructure
Conception
$5,506,573 CJ est. value
Tamaqua, PA 18252

SR 1013 over Stony Brook
Demolition, New Construction, Infrastructure
Design
$495,000 CJ est. value
Zion Grove, PA 17985

SR 1013 over Stony Brook
Demolition, New Construction, Infrastructure
Design
$495,000 CJ est. value
Zion Grove, PA 17985

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Paving in Landingville Borough
Infrastructure
Post-Bid
$200,000 est. value
Landingville, PA

Cold in Place Asphalt Recycling 2022 CIP Wild Cherry
Infrastructure
Results
PA

2022 Road Improvements
Infrastructure
Results
Ashland, PA

WF6 Research & Dev Lab for New Materials in Semiconductors
New Construction, Infrastructure - 45,000 SF
Construction
$300,000,000 CJ est. value
Hometown, PA 18252

SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

Southwest of Euclid Bridge
Demolition, New Construction, Infrastructure
Design
$1,961,171 CJ est. value
Franklin Township, PA 16001

2022 Road Improvement Project
Infrastructure
Post-Bid
$300,000 est. value
Pottsville, PA

Site Stair Replacement
Infrastructure
Results
$200,000 est. value
Pottsville, PA

US 22/322 PM
Infrastructure
Conception
$2,850,000 CJ est. value
West Hanover, PA 17112

SR 1003 - Brady Twp Line to SR 1001
Infrastructure
Design
$2,899,132 CJ est. value
Henderson Township, PA 16652

Last Updated 12/29/2023 08:33 AM
Project Title

RFP D/B - 61 Reconstruction Saint Clair - Frackville

Physical Address View project details and contacts
City, State (County) Cass Township, PA 17901   (Schuylkill County)
Category(s) Heavy and Highway, Outdoor Lighting
Sub-Category(s) Bridge, Maintenance, Paving/Reconstruction, Roadway Lighting, Shoreline/Erosion/Drainage, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected December 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $115,574,431 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This Partial Design/build Project Involves Full Depth Pavement Reconstruction, Safety Improvements Including Realignment of Several Substandard Curves, Installation of a Traffic Signal at Darkwater Road, Wider Shoulders, Reconstruction and/or Rehabilitation of Eight Culverts and Four Retaining Walls, Design/build Bridge, Slope Stabilization, Design/build Temporary Signal, Its Devices, Sign Structure, Design/build Ada Curb Ramps and Miscellaneous Construction as Indicated on the Approved Drawings Included in the Bid Package for State Route 61, Section 14m, in Schuylkill County, Townships of New Castle, Bltyhe, Ryan & West Mahanoy, Boroughs of Saint Clair and Frackville From Segments 0432/0433 Offsets 0342/0342 to Segments 0470/0471 Offsets 0908/0908, From Segment 0470 Offset 0908 to Segment 0490 Offset 0824 and From Segments 0490/0491 Offsets 0824/0827 to Segments 0500/0500 to Offsets 0016/0016. Project Cost Range: $100,000,000.00 - $124,999,999.99 Federal Project Status: Federal Oversight Structure Work: 17.00% Pre-bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: Reconstruction Responses to questions on this page are for informational and clarification purposes. Official changes to the proposal will be made via an Addendum. The deadline for submitting questions is 72 hours before the let date and time. For Emergency projects, the deadline is reduced to 19 hours before the let date and time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. PennDOT - RFP D/B - 61 Reconstruction Saint Clair - Frackville

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Earthwork Methods, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Retaining Walls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation, Bridges.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents