Similar Projects
Last Updated | 12/29/2023 08:33 AM |
Project Title | RFP D/B - 61 Reconstruction Saint Clair - Frackville |
Physical Address | View project details and contacts |
City, State (County) | Cass Township, PA 17901 (Schuylkill County) |
Category(s) | Heavy and Highway, Outdoor Lighting |
Sub-Category(s) | Bridge, Maintenance, Paving/Reconstruction, Roadway Lighting, Shoreline/Erosion/Drainage, Sidewalks/Parking Lot, Site Development |
Contracting Method | Bids by Invitation, Competitive Bids |
Project Status | Contract Award, Construction start expected December 2023 , Request For Proposals |
Bids Due | View project details and contacts |
Estimated Value | $115,574,431 [brand] Estimate |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This Partial Design/build Project Involves Full Depth Pavement Reconstruction, Safety Improvements Including Realignment of Several Substandard Curves, Installation of a Traffic Signal at Darkwater Road, Wider Shoulders, Reconstruction and/or Rehabilitation of Eight Culverts and Four Retaining Walls, Design/build Bridge, Slope Stabilization, Design/build Temporary Signal, Its Devices, Sign Structure, Design/build Ada Curb Ramps and Miscellaneous Construction as Indicated on the Approved Drawings Included in the Bid Package for State Route 61, Section 14m, in Schuylkill County, Townships of New Castle, Bltyhe, Ryan & West Mahanoy, Boroughs of Saint Clair and Frackville From Segments 0432/0433 Offsets 0342/0342 to Segments 0470/0471 Offsets 0908/0908, From Segment 0470 Offset 0908 to Segment 0490 Offset 0824 and From Segments 0490/0491 Offsets 0824/0827 to Segments 0500/0500 to Offsets 0016/0016. Project Cost Range: $100,000,000.00 - $124,999,999.99 Federal Project Status: Federal Oversight Structure Work: 17.00% Pre-bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: Reconstruction Responses to questions on this page are for informational and clarification purposes. Official changes to the proposal will be made via an Addendum. The deadline for submitting questions is 72 hours before the let date and time. For Emergency projects, the deadline is reduced to 19 hours before the let date and time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. PennDOT - RFP D/B - 61 Reconstruction Saint Clair - Frackville |
||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |