Similar Projects
Downtown Street Improvements - 946 - City of Calexico
Infrastructure
Conception
$400,000 CJ est. value
Calexico, CA 92231

Downtown Street Improvements - 946 - City of Calexico
Infrastructure
Conception
$400,000 CJ est. value
Calexico, CA 92231

Roadside Safety Improvements
Infrastructure
Design
$3,831,000 est. value
Holtville, CA

San Diego State University IV Dorms
New Construction, Infrastructure
Design
$50,000,000 CJ est. value
Calexico, CA 92231

Federally- And Locally- Funded South Center Street Paving Project
Infrastructure
Bidding
$500,000 CJ est. value
Westmorland, CA 92281

Federally- And Locally- Funded South Center Street Paving Project
Infrastructure
Bidding
$500,000 CJ est. value
Westmorland, CA 92281

Drilling Services
Term Contract
Post-Bid
Calexico, CA

Pavement Replacement
Infrastructure
Post-Bid
$280,000 est. value

EWWTP Well 3 Drilling
Infrastructure
Results
$587,085 CJ est. value
Elmira, CA 95625

Asphalt Rubber Binder Chip Seal, Pavement Markings and Shoulder Backing
Infrastructure
Results
$3,400,000 est. value
CA

Residence Inn by Marriott
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
El Centro, CA 92243

Statevolt Battery Gigafactory
New Construction, Infrastructure
Pending Verification
$4,000,000,000 CJ est. value
Brawley, CA 92227

Street Overlay - 956 - City of Calexico
Infrastructure
Conception
$10,500,000 CJ est. value
Calexico, CA 92231

Heber Meadows Apartments Residential Development / El Centro
New Construction, Infrastructure
Design
$108,633,600 CJ est. value
El Centro, CA 92243

Minor B - Small Business (SB) - Place Micro-Surfacing and Install Bike Facility
Infrastructure
Post-Bid
$330,000 CJ est. value
Calipatria, CA 92233

Last Updated 07/20/2023 09:59 AM
Project Title

Extension of Imperial Ave. from I-8 to Wake Ave. and Wake Ave. East of Imperial Ave. - Phase I

Physical Address View project details and contacts
City, State (County) El Centro, CA 92243   (Imperial County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $5,496,303 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of July 20, 2023, project was awarded to Pyramid Construction and Aggregates Inc., awarded amount in Phase I is $2,159,746.93 and Phase II is $3,336,556.17. Bid Valid:90 Calendar Days Liquidated Damages:$1,000 per Calendar Day Project Duration:200 Working Days Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% This project involves construction of a new roadway from the I-8 interchange to Wake Avenue and the westerly extension of Wake Avenue. Project will include grading of native soil, subgrade preparation, installation of Class II Base, installation of A.C. Pavement, Crack Sealing activities, Type II Slurry installation, installation of a storm drain swale and pipe, installation of PCC Sidewalk and Curb Ramps, adjustment of Utility Covers and Traffic Striping.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents