Similar Projects
Phoenixville Pike and Sidley Road/Yellow Springs Road Intersection Improvement Project - Charlestown Township
Infrastructure
Conception
$699,307 est. value
PA

US 30 and PA 82 Interchange Imp
Infrastructure
Conception
$141,323,000 CJ est. value
Coatesville, PA 19320

RFQ Design - Architect/Engineering Services for the Design of CDC/NIOSH Consolidated Cincinnati Research Facilities, Cincinnati, OH
Demolition, New Construction, Infrastructure - 235,000 SF
Design
$100,000,000 CJ est. value
Cincinnati, OH 45206

Unionville High School Varsity Baseball Field Renovations
Infrastructure
Design
$1,119,173 CJ est. value
Kennett Square, PA 19348

Priority B Interceptor Repairs Project
Infrastructure
Bidding
$5,992,830 CJ est. value
West Chester, PA 19380

E. Locust Lane over Red Clay Creek Project
Infrastructure
Bidding
$4,900,000 CJ est. value
East Marlborough Township, PA 19348

Bioswale Retrofit
Infrastructure
Post-Bid
$95,000 est. value
Devon, PA

2022 Street Work Project
Infrastructure
Post-Bid
$300,000 CJ est. value
Spring City, PA 19475

J056--Annual Gutter Maintenance and Inspection Coatesville VA Medical Center
Results
Coatesville, PA 19320

Campus Plaza & Fountain Project Phase I
Results
$1,500,000 to $2,200,000 est. value
West Chester, PA

Rail Yard Reconstruction and Bridge Rehabilitation - Coatesville
New Construction, Renovation
Construction
Coatesville, PA

Railroad Infrastructure Rehabilitation - Coatesville
Renovation
Construction
Coatesville, PA

Saint Michaels Villa
New Construction, Infrastructure
Pending Verification
$18,000,000 CJ est. value
Downingtown, PA 19335

Main Line Views Apartments - Phase 1
New Construction, Infrastructure
Pending Verification
$21,500,000 CJ est. value
Paoli, PA 19301

Fellowship Trail - Township of West Vincent
Infrastructure
Conception
$233,330 CJ est. value
Chester Springs, PA 19425

Last Updated 08/05/2022 10:38 AM
Project Title

Whitehorse Road Pumping Station Flood Protection Upgrades

Physical Address View project details and contacts
City, State (County) Charlestown Township, PA 19355   (Chester County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Storm/Sewers
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $800,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

All questions about the meaning or intent of the Contract Documents shall be submitted via PennBid's "Clarifications" tab. No questions will be accepted by phone, fax, or direct e-mail. Each bidder must deposit, with the bid, Security in the amount of 10 percent of the bid and subject to the conditions provided in the Instructions to Bidders. All bids shall remain irrevocable for sixty days after the actual date of the opening thereof unless award is delayed due to the required approval of another government agency, the sale of bonds, or the award of a grant or grants; in which case, bids shall be irrevocable for one hundred twenty days in compliance with Act 317 of 1978 approved November 26, 1978, as amended. Clarification Deadline 7/1/2022 5:00 Pm

Details

Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents