Similar Projects
Terminal Roof Replacement
Renovation
Sub-Bidding
$180,000 CJ est. value
Henderson, KY 42420

Warren County Board of Education - Aquatic Center Reroof
Renovation
Sub-Bidding
$403,000 CJ est. value
Bowling Green, KY 42103

Erpenbeck Elementary School Roof
Post-Bid
Florence, KY 41042

Pike Central High School Roof Replacement
Post-Bid
Pikeville, KY

Partial Roof Replacement at Various Schools
Renovation
Results
Louisville, KY 40203

Partial Roof Replacement at Newcomer Academy
Results
Louisville, KY 40218

Toombs Court and Latimer Heights Roof Replacement
Renovation
Construction
$390,000 CJ est. value
Danville, KY 40422

Versailles Public Wastewater Treatment Plant Administration Building Roof Replacement
Renovation
Sub-Bidding
$300,000 CJ est. value
Versailles, KY 40383

Install a New Cedar Shake Roof
Post-Bid
KY

Partial Roof Replacement at Seneca High School
Results
Louisville, KY 40220

Bowman Field RC Annex Roof Replacement
Renovation
Sub-Bidding
$356,235 CJ est. value
Louisville, KY 40205

Re-Roof
Post-Bid
Less than $4,617,000 est. value
Morganfield, Sturgis, KY 42437

Shingle Roofs
Results
Bowling Green, KY

Re-Roof Building 5B, 4D and Selected Decks
Renovation - 42,120 SF
Sub-Bidding
$300,000 CJ est. value
Lexington, KY 40508

Carter County Maintenance Garage Roof Overlay
Post-Bid
$67,000 est. value
Carter, KY

Last Updated 09/13/2022 02:35 AM
Project Title

DMA Williamsburg Armory Roof

Physical Address View project details and contacts
City, State (County) Williamsburg, KY 40769   (Whitley County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $450,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The project involves re-roof work at the DMA - National Guard Armory in Williamsburg, KY. The existing approximately 15,300 square foot roof to be removed is a 2 ply modified bitumen roof on metal deck. The new roof system is a Two Ply SBS Modified Bitumen in cold adhesive over cover board over rigid board insulation system. The first layer of insulation will be mechanically fastened. Additional layers and coverboard will be set in two part foam adhesive. The existing metal coping will be removed and replaced with a new pre-finished sheet metal coping. Existing counter flashings to be removed and replaced with new counter-flashings. Existing roof gutters and downspouts to be removed and replaced with new pre-finished metal gutters and downspouts.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents