Similar Projects
Vicinia
New Construction
Conception
San Antonio, TX 78251

Urbana at Cameron
New Construction
Conception
Pflugerville, TX 78660

The Lofts at Liberty Hill
New Construction
Design
Sherman, TX 75092

River Street Residences
New Construction - 408,315 SF
Design
$10,000,000 CJ est. value
Austin, TX 78701

Development Opportunities
Bidding
El Paso, TX 79905

Two Hermann Place
New Construction - 542,000 SF
Post-Bid
$10,000,000 CJ est. value
Houston, TX 77004

Urbana at Meadow Lake
New Construction
Post-Bid
Round Rock, TX 78665

2016 Floods Housing Assistance Program - Glo Contract
Results
Less than $1,379,255 est. value
TX

Redevelopment of the Approximately 19-Acre St. John Site
Results
Austin, TX 78767

Stacy Green
New Construction
Construction
Allen, TX 75013

Village at Lewisville
New Construction - 324,668 SF
Construction
$10,000,000 CJ est. value
Lewisville, TX 75057

Urbana at Centerville
New Construction
Conception
Garland, TX 75040

Preston Center Apartment Tower
New Construction
Design
Dallas, TX 75225

Natiivo Tower
New Construction - 266,131 SF
Construction
$10,000,000 CJ est. value
Austin, TX 78701

Urbana at Cottonwood Creek / Hutto
New Construction, Infrastructure
Design
Less than $30,000,000 est. value
Hutto, TX 78634

Reported 06/21/2022 07:40 AM
Project Title

Zoe Luxury Apartments

Physical Address View project details and contacts
City, State (County) Bellmead, TX 76705   (McLennan County)
Category(s) Residential
Sub-Category(s) Apartments/Condominiums
Contracting Method Bids by Invitation.
Project Status Construction Documents, Construction Start Expected August 2022, Construction Completion Expected August 2023
Bids Due View project details and contacts
Estimated Value $18,014,224 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

An architect has been selected. As of June 17, 2022 general contractor information has not been disclosed. Construction is anticipated to begin August 2022.

Details

Apartments/Condominiums, 3 Stories Above Grade, Approximately 100,000 SF New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents