Similar Projects
DFCM Construction - Pre Qualified Mechanical - UVU CS Bldg HVAC and Fire Damper Upgrades
Term Contract
Bidding
$395,000 est. value
Orem, UT 84058

Canterbury Furnaces
Alteration
Bidding
Salt Lake City, UT

Parks and Recreation Building HVAC Upgrades
Post-Bid
Less than $497,592 est. value
Salt Lake City, UT 84104

Canyonlands Field Airport Upgrade to Terminal Building Roof Top Units
Post-Bid
Moab, UT 84532

DFCM Construction-Standard Low Bid-DWS Admin Building HVAC and Controls (Bas/Access)-Phase II
Results
$985,800 est. value
Salt Lake City, UT 84101

Holbrook Elementary Hvac Renovation
Results
$1,000,000 to $1,250,000 est. value
Bountiful, UT 84010

HVAC Contractors
Post-Bid
Saint George, UT 84770

East Layton Elementary Boiler and Chiller Replacement
Results
$125,000 to $250,000 est. value
Layton, UT 84040

Salt Lake County Automatic Build DDC and HVAC Controls
Term Contract
Post-Bid
Salt Lake City, UT 84190

Residential HVAC Services
Term Contract
Results
Salt Lake City, UT 84114

Commercial HVAC and Building Controls Pt.2
Term Contract
Post-Bid
Salt Lake City, UT 84114

Mechanical Upgrades
Results
Ogden, UT 84404

H999--Test, Inspect and Certify Medical Air, Oxygen, Nitrus Oxide and Medical Vacuum Systems
Post-Bid
Salt Lake City, UT

SLCo ADC Heat Exchanger Replacement
Results
$90,000 to $100,000 est. value
Salt Lake City, UT 84119

SLCC TRC CT Dust Collector
Post-Bid
Salt Lake City, UT 84130

Last Updated 08/12/2021 06:51 AM
Project Title

DFCM Construction - UVU Browning Admin Building Air Handler Components Upgrades

Physical Address View project details and contacts
City, State (County) Orem, UT 84058   (Utah County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $480,500
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work includes the removal and replacement of AHU-1,AHU-1B, AHU-2B existing fans with new fan arrays. Remove and replace all existing VFDS and controls serving AHU-1, AHU-1B, AHU-2B. Remove AHU-1's existing control valve serving the heating coil. Provide new pressure independent control valve to serve AHU-1's heating coil. Remove and replace AHU-3 and the existing glycol system serving the pre-heat coil. Provide new piping, pump and heat exchanger to serve new pre-heat coil.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents