Similar Projects
Bob Jones Park Improvements
Renovation
Conception
$28,000,000 est. value
Southlake, TX

New Southwest Community Park
New Construction
Conception
$30,000,000 est. value
Mansfield, TX

Phase 3 School Bond Renovation
Renovation, Demolition
Design
Arlington, TX 76010

Y--Lyjo 290111 - Lyndon B Johnson National Historic Park Rehabilitate Texas White
Renovation
Bidding
$5,000,000 to $10,000,000 est. value
Stonewall, TX 78671

Construction of Walking Trail at King-Kennedy Memorial Park
New Construction
Bidding
Kendleton, TX 77451

Rick Oden Park Phase 1A
Post-Bid
Garland, TX 75041

Jovita Idar Park
Post-Bid
Laredo, TX 78043

JFK Park Construction
Results
$2,395,000 est. value
Dallas, TX 75200

CDBG Funded West Park Playground Renovation
Results
$350,000 est. value
Irving, TX 75038

Water Crest On Lake Conroe Section 10 Dog Park
New Construction - 1,500 SF
Construction
Conroe, TX 77384

Del Rio Community Sports Park
Construction
$1,305,000 est. value
Del Rio, TX 78840

Gateway Park Development
Infrastructure
Conception
$8,000,000 est. value
Fort Worth, TX

Public Safety Training Campus Running Track
Infrastructure
Bidding
$800,000 est. value
Austin, TX 78744

D3 Designing Downtown Denison Phase 1
Post-Bid
Denison, TX 75020

Danieldale and Willoughby Parks Playground Replacements
Results
$300,000 to $350,000 est. value
Dallas, TX 75232

Last Updated 02/28/2022 02:29 PM
Project Title

Playground Renovation and Accessibility Improvement

Physical Address View project details and contacts
City, State (County) El Paso, TX   (El Paso County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Provide design, alternatives, and detailed cost estimate to remove the existing play structures and replace with a new ADA and CPSC safety compliant play structures within the existing playground footprint. The existing rubber tiles will be removed and a new poured-in-place surfacing installed. The existing engineered wood fiber (EWF) surfacing will be removed and replaced with 6” thick rubber mulch. An existing section of curb on the edge of the playground will be removed and replaced with a concrete seat wall.

Details

Park/Playground, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents