Similar Projects
4-0 Triplex UG (Sweetbriar), 350 Triplex CIC Wesleyan and 1-0 Primary CIC Utility Wire
Term Contract
Sub-Bidding
Dothan, AL 36301

1/0 Triplex UD Secondary Utility Cable (Brenau)
Term Contract
Sub-Bidding
Dothan, AL 36301

Weatherization Service
Term Contract
Post-Bid

FY22 USACE Nashville District Design-Build and Design-Bid-Build Multiple Award Task Order Contract (MATOC)
Term Contract
Post-Bid
Nashville, TN 37219

500 EPR CU Under Ground Primary Wire
Term Contract
Sub-Bidding
Dothan, AL 36301

Heavy Duty Motor Starters for Water Production Wells
Term Contract
Post-Bid
Dothan, AL 36301

Rip Rap Class I and II, Crushed Aggregate Base (Granite) and #57 Crushed Stone (Granite Rock)
Term Contract
Post-Bid
Dothan, AL 36301

Machine Crushed Concrete, Sand Clay Base and Fill Sand
Term Contract
Post-Bid
Dothan, AL 36301

4/0 Triplex UD Secondary CIC (Sweetbriar) on 2500' Coils
Term Contract
Post-Bid
Dothan, AL 36301

Vegetation Management of the Electric System
Term Contract
Post-Bid
Dothan, AL 36301

Hot Asphalt Plant Mix
Term Contract
Post-Bid
Dothan, AL 36301

Distribution Transformer and Equipment Repair and Recycling Service
Term Contract
Post-Bid
Dothan, AL 36301

Crusher Run - 825A Limestone Base
Term Contract
Post-Bid
Dothan, AL 36301

Durham 3 Phase Primary Sectionalizing Pedestal Cabinets
Term Contract
Post-Bid
Dothan, AL 36301

Rip Hewes Stadium Grounds Maintenance and Clean-Up
Term Contract
Post-Bid
Dothan, AL 36301

Last Updated 11/21/2022 01:37 AM
Project Title

4" PVC Conduit with Bell End

Physical Address View project details and contacts
City, State (County) Dothan, AL 36301   (Houston County)
Category(s) Single Trades
Sub-Category(s) Service/Term Contracts
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Conduit shall be a Schedule 40, 4-inch PVC Conduit, GREY in color, with bell end in 10-foot lengths, having an I.D of 3.96 inches and O.D. of 4.5 inches and 0.24 inch wall thickness. The conduit shall meet UL 651/ NEMA TC 2 standards. 4" Schedule 40 Perforated, Solvent Weld, Belled End PVC Pipe, as per City of Dothan specifications. Clarification Deadline 8/22/2022 2:00 Pm

Details

Division 01 - General Requirements.
Division 10 - Specialties.
Division 11 - Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents