Similar Projects
Repave Streetscape at Justice Center
Post-Bid
Ballwin, MO 63011

2021 Road Improvements
Post-Bid
Indian Point, MO

Intersection Improvements
Results
Gladstone, MO 64119

Sunridge Park Asphalt and Sealing Project 2021
Results
Hillsboro, MO 63050

Roadwork
Post-Bid
Kirksville, MO

Highway 210 and Walker Road Intersection Improvements
Results
North Kansas City, MO

Improving Mueller Road
Infrastructure
Post-Bid
Green Park, MO 63123

2021 Mill and Overlay Program
Results
Gladstone, MO

Sidewalk Removal and Replacement
Alteration
Post-Bid
Potosi, MO 63664

2021 Intermediate Maintenance Program
Results
Gladstone, MO

Transportation Shop Concrete Project
Infrastructure
Post-Bid
Potosi, MO

2021 Mill, Mat and Asphalt Overlay Program
Results
Festus, MO

Asphalt Overlay Portions of Perry County Roads
Alteration
Post-Bid
MO

Route 9 Improvements
Results
Parkville, MO 64152

2021 Asphalt Pavement Improvement
Infrastructure
Post-Bid
Jackson, MO

Last Updated 12/20/2021 03:39 AM
Project Title

Resurface, ADA improvement and Pavement improvements

Physical Address View project details and contacts
City, State (County) (Pike, Ralls Counties)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $7,500,000 to $10,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

(1): Job J2P3211 Route 79 PIKE, RALLS County. Resurface from Routes E and N to 0.8 Mile South of Route 54 East Junction in Louisiana, the total length of improvement being 24.52 miles. (2): Job J2P3218 Route 54, 79 PIKE County. ADA improvement from Dougherty Pike to 4th Street and Noyes Street to South Carolina Street in Louisiana, the total length of improvement being 0.657 miles. (3): Job J2P3346 Route 54, 79 PIKE, RALLS County. Pavement improvements from Routes E and N to 0.1 Mile North of Route 54 near Louisiana, the total length of improvement being 22.071 miles.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents