Similar Projects
Expansion Fire Medical Station Number 6 - City of Lawrence
New Construction, Infrastructure
Conception
$6,000,000 CJ est. value
Lawrence, KS 66044

Stadium Improvements - North End Zone and West Side - University of Kansas
Renovation
Conception
$170,000,000 CJ est. value
Lawrence, KS 66044

Ridgeview Corporate Centre
New Construction, Infrastructure - 245,000 SF
Design
$141,500,000 CJ est. value
Olathe, KS 66061

City of Lawrence Field Operations Campus
New Construction, Infrastructure
Design
$29,000,000 CJ est. value
Lawrence, KS 66044

11th & Louisiana Street Improvements
Infrastructure
Bidding
$2,000,000 CJ est. value
Lawrence, KS 66044

24 Inch Pipe and Valve Rehabilitation at Clinton Lake Project in Lawrence
Infrastructure
Bidding
$500,000 CJ est. value
Lawrence, KS 66047

Valvoline Instant Oil Change / Lawrence
Demolition, New Construction, Infrastructure - 2,025 SF
Post-Bid
$1,100,000 CJ est. value
Lawrence, KS 66046

BIA Design & Install Track Outdoor Recreation Facilities, Haskell
Demolition, New Construction, Build-out, Renovation, Infrastructure
Post-Bid
$10,000,000 CJ est. value
Lawrence, KS 66046

Lawrence Multimodal Transfer Center
New Construction, Infrastructure
Results
$3,838,960 CJ est. value
Lawrence, KS 66049

2022 Microsurfacing, Milling, Patch, Overlay and Concrete Maintenance Program
Infrastructure
Results
$2,527,717 CJ est. value
Lawrence, KS 66044

Berry Global Addition
Addition, Demolition, Infrastructure
Construction
$1,500,000 CJ est. value
Lawrence, KS 66049

Schlumberger / Lawrence
Addition, New Construction, Infrastructure - 1,300 SF
Construction
$700,000 CJ est. value
Lawrence, KS 66049

902 Storage / Lawrence
New Construction, Infrastructure
Pending Verification
$800,000 CJ est. value
Lawrence, KS 66049

Plastikon Healthcare Expansion
Addition, Infrastructure - 17,000 SF
Pending Verification
$1,200,000 CJ est. value
Lawrence, KS 66046

Renovation of Allen Fieldhouse - University of Kansas
Renovation
Conception
$20,000,000 CJ est. value
Lawrence, KS 66045

Last Updated 12/18/2023 02:37 PM
Project Title

RFP Gateway District Developer

Physical Address View project details and contacts
City, State (County) Lawrence, KS 66044   (Douglas County)
Category(s) Commercial, Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Athletic Facility, Convention/Exhibit Center, Retail, Site Development, Stadium
Contracting Method Competitive Bids
Project Status Construction start expected July 2024 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $335,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The University of Kansas is taking an important step in developing its new campus gateway at the intersection of 11th and Mississippi streets in Lawrence, Kansas. The University of Kansas (“University”) is seeking a proposal to be a P3 Master Developer or Mixed-Use Developer (“Developer”) to develop and operate a proposed mixed-use development (“Mixed-Use Development”), including an entertainment venue (“Entertainment Venue”), and to assist the University in the redevelopment of the east and south sides of the David Booth Kansas Memorial Stadium (“Stadium-East”). The west and north sides of the Stadium and the Conference Center (“Stadium-West”) are already in development and being led by the University (“University Gateway Project Phase 1”). For purposes of this Request for Proposal, the Mixed-Use Development (which may include an Entertainment Venue), and the Stadium-East are all together considered to be the “University Gateway Project Phase 2”. It remains unclear whether the University Gateway Project Phase 2 will actually occur in one or multiple phases. Collectively all phases are defined as the “University Gateway Project”. The University is seeking proposals from Respondents to help it deliver the University Gateway Project. In addition to the development program set forth in this RFP, the University is open to receiving alternative suggestions to the proposed development program that enhances the financial performance of the University Gateway Project Phase 2. The University’s preference is to contract with a single entity comprised of individual companies to serve as the Developer of the University Gateway Project Phase 2 but reserves the right to contract with several entities if that approach is in the University’s best interest. Preference will also be given to proposals that include development of Stadium-East and parking as needed. Respondents should carefully review Section 2 of this RFP; it combines the elements of the previously issued P3 Developer and Mixed-Use Developer Requests for Proposals. The scope and requirements are generally the same, although changes have been made to reflect the University’s current thinking about the opportunity. Section 3 Terms and Conditions is unchanged from the prior document. Revisions to Section 4 Supplemental Material retain only that material that is relevant for the current opportunity.d in this RFP.

Details

Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Concrete Finishing, Precast Concrete, Cast Decks and Underlayment, Concrete Cutting and Boring.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing, Decorative Metal.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Specialty Doors and Frames, Coiling Doors and Grilles, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Hardware, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Painting and Coating, Painting, Exterior Painting, Interior Painting, Special Coatings.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Partitions, Toilet, Bath, and Laundry Accessories, Safety Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Metal Storage Shelving, Flagpoles.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Parking Control Equipment, Loading Dock Equipment, Pedestrian Control Equipment, Commercial Laundry and Dry Cleaning Equipment, Unit Kitchens, Office Equipment, Foodservice Equipment, Audio-Visual Equipment, Athletic and Recreational Equipment, Athletic Equipment, Interior Scoreboards, Play Field Equipment and Structures, Athletic Field Equipment, Exterior Scoreboards, Therapy Equipment.
Division 12 - Furnishings, Casework, Rugs and Mats, Office Furniture, Multiple Seating, Fixed Audience Seating, Stadium and Arena Seating, Site Furnishings, Trash and Litter Receptacles.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms, Athletic and Recreational Special Construction, Fabricated Engineered Structures.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Facility Lightning Protection, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Earthwork Methods, Soil Treatment, Special Foundations and Load-Bearing Elements.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents