Similar Projects
Spanish Fort High School Baseball Drainage and Other Improvements
New Construction, Addition
Results
$94,755 est. value
Bay Minette, AL

Gulf of Mexico Artificial Reef Construction Project
Results
Gulf Shores, AL

Morphy Avenue Substation Site Work
Infrastructure
Results
$378,086 est. value
Fairhope, AL

Quail Creek NRHS Project
Infrastructure
Results
$399,702 est. value
Fairhope, AL

Provision of Corrugated Round and Arch Bituminous Coated (Metal) Pipe
Results
AL

Gulf of Mexico Artificial Reef Construction Project
Results
Gulf Shores, AL

Construction Pipe and Culvert Procurement
Results
Foley, AL

City-Wide Drainage Maintenance FY 2021
Infrastructure
Results
$150,000 est. value
Gulf Shores, AL

Summit Drive NRCS EWP Project
Infrastructure
Results
Fairhope, AL

Wakefield Canal Restoration
Infrastructure
Post-Bid
Spanish Fort, AL 36527

Stream and Drainage Cleanout
Term Contract
Post-Bid
Foley, AL

Drainage Improvements for Oak Street and Section Street at Bid Mouth Gully
Results
Less than $233,415 est. value
Fairhope, AL 36532

Drainage Improvements on CR 11
Infrastructure
Bidding
AL

Alabama Point Seawall Repair Design
Term Contract, Infrastructure
Post-Bid
$2,488,000 est. value
Orange Beach, AL

Drainage Rehabilitation (Materials Only)
Post-Bid
Robertsdale, AL

Last Updated 12/10/2021 08:52 AM
Project Title

Fels Avenue and Pier Avenue Drainage Improvement Project

Physical Address View project details and contacts
City, State (County) Fairhope, AL 36532   (Baldwin County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $67,226
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work entails the upgrade and replacement of the storm water drainage system at two locations in the Fruit and Nut Section of Fairhope, Alabama. The first location is on the south side of the 50 block of Fels Avenue west of the intersection of Bayview Street South and within 100 linear feet of the intersection of Short Street. The second location is on the north side in the 100 block of Pier Avenue just west of the intersection of Kumquat Street. Fels Avenue involves ±136 linear feet of new stormwater drainage and Pier Avenue involves ±144 linear feet of new stormwater drainage. Both project locations have work that includes but is not limited to inlets, junction boxes, placement of new reinforced concrete pipe (RCP), replacement curb & gutter, asphalt patching, driveway aprons, grading and stabilization.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents