Similar Projects
BP HS-1 Salem High School Auditorium
Renovation
Bidding
Canton, MI 48187

Wayne Memorial High School Addition and Remodeling Project
Renovation, Addition
Post-Bid
Westland, MI

2020 Hillside MS/Meads Mill MS Signage and Gym Remodeling
Renovation
Post-Bid
Northville, MI

Clarenceville Schools: Bathroom Renovations
Results
Livonia, MI

Board Office New Bathroom Construction 2019
New Construction
Results
Lincoln Park, MI

Final Cleaning Package
Post-Bid
Grosse Pointe, MI 48236

Miscellaneous Renovations - Bid Package 21
Results
Plymouth, MI

Summer 2021 Work Program Brownell Middle School
Renovation
Post-Bid
Grosse Pointe, MI 48236

High School And Middle School Toilet Room Renovation
Results
Garden City, MI

2019 Bond Renovations, Bid Package 2 and 3
Renovation
Post-Bid
Lincoln Park, MI 48146

Bus Loop and Parking Enhancement
Results
Romulus, MI 48174

JGHS Remodeling, JGHS and WMHS Sitework, Stevenson MS Sitework
Renovation
Post-Bid
Wayne, Westland, MI 48184

Disaster Recovery Services
Results

Summer 2021 Work Program - North High School
Post-Bid
Grosse Pointe Woods, MI 48236

2021 Central Office Building Renovation
Renovation
Results
Livonia, MI 48150

Reported 08/25/2021 12:00 AM
Project Title

Exterior Renovations South High School

Physical Address View project details and contacts
City, State (County) Grosse Pointe Farms, MI 48236   (Wayne County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value $100,000
Plans Available from Architect - 08/03/21
Owner View project details and contacts
Architect View project details and contacts
Description

For the exterior site renovation work at Grosse Pointe South High School.The work generally consists of: Removal of existing paving, trees, mulch, vegetation, etc. as designated on the drawings Regrade portions of site as indicated on the drawings Install new drainage pipe, structures, etc. as indicated on the drawings Install areawell concrete extensions as indicated on the drawings Install new paving as indicated on the drawings Install new landscape materials, lawn, etc. as indicated on the drawings

Details

Middle/Senior High School, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents