Similar Projects
Reservoir Cover Replacement
New Construction
Post-Bid
$2,000,000 est. value
Aberdeen, WA

Cottonwood Island Pile Dike Repair
Renovation, Infrastructure
Post-Bid
Kelso, WA 98626

Culmback Dam 48 Inch Cone Valve Replacement Project
Renovation
Results
WA

6MG1 Reservoir Recoating and Vent Replacement
Renovation
Results
$3,400,000 to $3,700,000 est. value
Kent, WA

Y--Fish Screen Replacement - Roza Diversion Dam
Term Contract
Post-Bid
Yakima, WA 98901

Y--Fish Screen Replacement - Roza Diversion Dam
Term Contract
Post-Bid
Yakima, WA 98901

Chief Joseph Dam Station Service Refurbishment - Turbines & Generators
Renovation
Bidding
$10,000,000 to $25,000,000 est. value
Bridgeport, WA 98813

Mill Creek Diversion Dam Fish Ladder
New Construction
Post-Bid
$5,000,000 to $10,000,000 est. value
Walla Walla, WA 99362

Furnishing and Installing Seismic Upgrades
New Construction
Results
$2,700,000 est. value
Lakewood, WA 98259

Chief Joseph Dam, Upstream Spillway Monolith Sealing
Renovation
Post-Bid
Bridgeport, WA

Reported 03/04/2022 11:40 AM
Project Title

LWSC Large Lock Center Gate Replacement

Physical Address View project details and contacts
City, State (County) Seattle, WA 98113   (King County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Pre-Solicitation
Bids Due View project details and contacts
Estimated Value $10,000,000 to $25,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Lake Washington Ship Canal: equires replacement of the Lake Washington Ship Canal (LWSC) Large Lock Center Gates (LLCG) and incidental related work. The work involved in this project includes, but are not limited to, fabricating, testing, painting, delivering, and installing new miter gate assemblies, removing the existing decommissioned miter gates, disconnecting the existing gates from the operating machinery, reconnection of the operating machinery to the new miter gates, commissioning of the miter gates, and concrete work associated with the miter gate installation. The new miter gate assemblies are primarily a welded structure consisting of 2 leafs, measuring approximately 46 feet wide by 60 feet tall, with each leaf weighing approximately 180,000 pounds without silt/debris. The project will include replacement of the lock chamber appurtenances which affect the miter gate installation, which includes the concrete embedded wall quoin, concrete embedded pintle base, pintle ball/bushing, and anchorage bars. The commissioning of the miter gates will not only include the final installation of the miter gates, but also how the gate interfaces with the embedded wall quoin, miter seals, pintle assemblies, and existing operating machinery and sensors which control gate movement. The project will also include the installation of new concrete embedded connection castings and replacement of the HDPE seal located on the miter gate sill near the bottom of the lock chamber.

Details

Dam/Tunnel, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents