Similar Projects
Lakehaven Phase 1 MBR Wastewater Treatment Plant - Electrical and Mechanical
Renovation
Bidding
$160,000 CJ est. value
Federal Way, WA 98003

Orchard Street Drainage Improvement Project
Infrastructure
Bidding
$150,000 CJ est. value
Peshastin, WA 98847

Residential Home Repair - Plumbing Repairs
Renovation
Sub-Bidding
$50,000 CJ est. value
Tacoma, WA 98418

Structural Leak Joint Sealant and Grouting Repairs Work Order
Alteration
Post-Bid
WA

Chief Joseph Dam Spillway Monolith Sealing, Bridgeport, Washington
Renovation, Infrastructure
Post-Bid
$10,000,000 CJ est. value
Bridgeport, WA 98813

Mechanical and Plumbing On Call Portwide
Alteration
Results
$300,000 est. value
Seattle, WA

URGENT Residential Plumbing Repair
Alteration
Results
Spanaway, WA

PFAS Treatment Facilities
Addition, Demolition, Infrastructure, Renovation
Bidding
$6,000,000 CJ est. value
Dupont, WA 98327

Mechanical MATOC
Term Contract
Post-Bid
$2,000 to $500,000 est. value
WA

MHR - Urgent Residential Plumbing Repairs
Alteration
Results
$2,950 est. value
WA

MHR - Residential Plumbing ADA Conversion
Term Contract
Post-Bid
Tacoma, WA 98421

Weatherization Residential Insulation 8550
Alteration
Results
Eatonville, WA

Install Eye Wash for Housekeeping Sinks Campus Wide
Alteration
Post-Bid
Spokane, WA 99205

Rainier Community Center ADA Barrier Removal
Term Contract
Results
$1,277,240 est. value
Seattle, WA 98118

City Hall Entryway and Plumbing Improvements
Renovation, Alteration
Post-Bid
Normandy Park, WA

Last Updated 05/03/2023 06:32 PM
Project Title

Wastewater Lift Station 8 Upgrade

Physical Address View project details and contacts
City, State (County) Woodland, WA 98674   (Cowlitz County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $312,964 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

**As of May 1, 2023, this project has been awarded to Tapani Inc., in the amount of $312,963.95. The Wastewater Lift Station 8 Upgrade project consists of furnishing all labor, materials, and equipment necessary for construction of the lift station upgrade including installation of bypass pumping facilities, demolishing of the existing equipment and structures, installation of two new Owner-furnished submersible centrifugal pumps in the existing wet well, construction of a new valve vault, coating of the existing wet well and new valve vault, construction of a new force main connection to the existing force main, construction of new top slab with access hatch for the existing wet well, installation of an Owner-furnished control panel and appurtenances, and furnishing and installation of all other electrical, instrumentation, and telemetry work. The Work shall be substantially complete within 50 working days after the commencement date stated in the Notice to Proceed. The City of Woodland expressly reserves the right to reject any or all Proposals and to waive minor irregularities or informalities in any Proposal. All Proposals must be accompanied by a certified check, postal money order, cashier's check, or Proposal bond payable to the "City of Woodland" and in an amount of not less than five percent (5%) of the total Proposal amount.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents