Similar Projects
Bunky Boutique
Build-Out
Conception
Gilbert, AZ 85296

Wylde Salon
Build-Out
Conception
Gilbert, AZ 85296

Central AZ Supply/Potato Barn - Gilbert, AZ
New Construction - 14,000 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Gilbert, AZ 85295

Commercial & Retail Development Pad
New Construction
Design
Glendale, AZ 85308

Watermark at Lake Pleasant Parkway
New Construction
Post-Bid
$10,000,000 CJ est. value
Peoria, AZ 85383

Lowe's
Renovation - 1,090 SF
Post-Bid
Gilbert, AZ 85296

2017-2018 Downtown Development
Results
Phoenix, AZ

Ageez Hair Center
Renovation - 1,365 SF
Results
Phoenix, AZ 85041

Daybreak Apartments - Tempe, AZ
New Construction - 58,445 SF
Construction
$3,500,000 est. value
Tempe, AZ 85281

Blocks on Roosevelt
New Construction - 18,285 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Phoenix, AZ 85004

Hawes Crossing - Master Plan
New Construction
Pending Verification
Mesa, AZ 85212

Midtown High-Rise Mixed-Use Development
New Construction
Conception
Phoenix, AZ 85012

Papago Plaza - Retail Space and Parking Garage - SIte
New Construction, Demolition - 208,000 SF
Design
$11,000,000 to $16,000,000 est. value
Scottsdale, AZ 85257

Talavi Towne Center - Anchor Building Exterior Remodel
Renovation - 83,766 SF
Post-Bid
Glendale, AZ 85301

723 West Polk Street Parcels Disposition and Redevelopment
Results
Less than $1,605,000 est. value
Phoenix, AZ 85007

Last Updated 05/20/2021 03:45 AM
Project Title

Building Elevators Upgrade

Physical Address View project details and contacts
City, State (County) Tempe, AZ 85281   (Maricopa County)
Category(s) Commercial
Sub-Category(s) Retail
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed work will consist of modernization of the 525 building elevators and upgrading the existing 3,500 lbs. two (2) elevators. Mechanical and electrical work includes dedicated room cooling unit and circuits for replacement of hydraulic elevators. Circuits include dedicated pit receptacles and lighting, equipment room lighting, and elevator controller refeeds, together with associated work.

Details

Retail, Renovation.
Division 01 - General Requirements.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 08 - Openings, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Door Hardware.
Division 14 - Conveying Equipment, Commissioning of Conveying Equipment, Commissioning of Elevators, Elevators, Electric Traction Elevators, Electric Traction Passenger Elevators, Elevator Equipment and Controls.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents