Similar Projects
Arlington Boathouse - Arlington County
New Construction, Infrastructure
Conception
$18,695,000 CJ est. value
Arlington, VA 22209

Pickett Street & Burnside Place Multi-Residential - Phase II / Alexandria
New Construction, Infrastructure - 473,000 SF
Conception
$75,000,000 CJ est. value
Alexandria, VA 22304

Cava Manufacturing Plant
New Construction - 57,000 SF
Design
$30,000,000 est. value
Verona, VA 24482

S.L. Williamson Replacement Asphalt Plant
New Construction, Renovation - 123,457 SF
Design
North Garden, VA 22959

Verona Pedestrian Improvements
Infrastructure
Bidding
$1,247,000 CJ est. value
Verona, VA 24482

RFP/Q Construction Manager - Fontaine Central Energy Plant and Utilities
New Construction, Infrastructure
Bidding
$55,000,000 CJ est. value
Charlottesville, VA 22902

RFQ Contractor - Phlipott Landslide Construction
Infrastructure
Post-Bid
$10,000,000 CJ est. value
Bassett, VA 24055

RFQ Contractor - Phlipott Landslide Construction
Infrastructure
Post-Bid
$10,000,000 CJ est. value
Bassett, VA 24055

Multi-Use Trail Construction Projects
Infrastructure
Results
$400,000 CJ est. value
Hillsboro, VA 20132

Multi-Use Trail Construction Projects
Infrastructure
Results
$400,000 CJ est. value
Hillsboro, VA 20132

Westyn Phase 2 Residences
New Construction, Infrastructure
Construction
$40,000,000 CJ est. value
Forest, VA 24551

Bonumose Facility Expansion
New Construction - 50,000 SF
Construction
$27,700,000 est. value
Charlottesville, VA 22909

Stonefield Town Center Block C2-1
New Construction, Infrastructure
Pending Verification
$8,500,000 CJ est. value
Charlottesville, VA 22902

Green Re-Leaf
Renovation
Pending Verification
Portsmouth, VA

East and West Nelson Avenue from Russell Road to Leslie Avenue - City of Alexandria
Infrastructure
Conception
$200,000 CJ est. value
Alexandria, VA 22301

Last Updated 02/13/2023 04:05 PM
Project Title

Ladysmith Industrial Park

Physical Address View project details and contacts
City, State (County) Ruther Glen, VA 22546   (Caroline County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $15,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of February 13, 2023, owner transferred land and was approved Subdivsion, construction was already completed. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

28,000 SF.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents