Similar Projects
Indefinite Delivery/Indefinite Quantity Electronic Security Systems (ESS) 7th Generation
Term Contract
Design
Less than $675,000,000 est. value

Replace Building 160 Switchgear - Project Number 621-22-118
Term Contract
Design
$500,000 to $1,000,000 est. value
Johnson City, TN 37604

5925--36C249-21-Ap-1762 -621-21-105-Rep. Def. Breakers Bldg 115
Post-Bid
Johnson City, TN 37604

Stock Material
Post-Bid
Johnson City, TN 37615

Electrical Services Contract
Term Contract
Results
Johnson City, TN

Stock Material
Post-Bid
Johnson City, TN 37615

Stock & Without material
Post-Bid
Johnson City, TN 37615

1-Ph Pad Mount Transformers
Post-Bid
Johnson City, TN 37615

Broadband Stock Material
Post-Bid
Johnson City, TN 37615

Weathering Steel Poles
Post-Bid
Johnson City, TN 37615

1-Ph Pad Mount Transformers
Post-Bid
Johnson City, TN 37615

Stock Material
Post-Bid
Johnson City, TN 37615

Stock Material
Post-Bid
Johnson City, TN 37615

Replace Defective Breakers Building 115
Post-Bid
Johnson City, TN 37604

SWC 436 Lamps, Batteries and Scrap Metal Recycling
Term Contract
Post-Bid

Reported 03/15/2022 12:00 AM
Project Title

Replace Building 200 Main Distribution Switchgear Breakers

Physical Address View project details and contacts
City, State (County) Johnson City, TN 37604   (Washington County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Project #36C249-22-Ap-0990 - Replace Building 200 Main Distribution Switchgear Breakers: building 200 main distribution switchgear is a critical part of the electrical distribution system for the main hospital. This switchgear supplies power to critical areas of the hospital including the OR and ICU. The switchgear consists of a main distribution section that includes a 3200A main breaker and six (6) draw out style distribution breakers and an integral switchboard. The switchboard section is currently undergoing a retrofit to modernize the switchboard section and install new breakers. The current distribution breakers have reached the end of their useful life as well and need to be replaced. contractor shall be required to furnish all labor, materials, transportation, equipment, tools, and supervision to perform

Details

Division 26 - Electrical, Medium-Voltage Switchgear, Medium-Voltage Circuit Breaker Switchgear.
Division 33 - Utilities, High-Voltage Switchgear and Protection Devices, Air High-Voltage Circuit Breaker, Oil High-Voltage Circuit Breaker, Gas High-Voltage Circuit Breaker, Vacuum High-Voltage Circuit Breaker, Medium-Voltage Utility Switchgear and Protection Devices, Air Medium-Voltage Circuit Breaker, Oil Medium-Voltage Circuit Breaker, Gas Medium-Voltage Circuit Breaker, Vacuum Medium-Voltage Circuit Breaker.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents