Similar Projects
Wastewater Treatment Plant Solids Treatment Upgrade and Expansion Project
Addition, Demolition, Renovation, Infrastructure
Design
$10,000,000 CJ est. value
Manhattan, KS 66502

EMS Headquarters - Archimages
New Construction, Infrastructure
Design
$12,300,000 CJ est. value
Manhattan, KS 66502

Booster Pump Station Improvements
Renovation, Infrastructure
Bidding
$430,000 CJ est. value
Manhattan, KS 66502

1200 Block Alley
Infrastructure
Bidding
$297,197 CJ est. value
Manhattan, KS 66502

Intelligent Transportation System
Infrastructure
Sub-Bidding
$50,000 CJ est. value
Riley, KS 66531

Asphalt Overlay Improvements
Infrastructure
Post-Bid
$500,000 est. value
Randolph, KS

2022 Corrugated Metal Pipe and Bands
Infrastructure
Post-Bid
Manhattan, KS

2021 Asphalt Street Maintenance Phase I
Infrastructure
Results
Manhattan, KS

Browning and Butterfield Waterline Package
Infrastructure
Results
Manhattan, KS

Tropic Smoothie Cafe / Manhattan
New Construction, Infrastructure
Design
$1,000,000 CJ est. value
Manhattan, KS 66502

Milling and HMA Overlay
Infrastructure
Bidding
$800,000 CJ est. value
Leonardville, KS 66449

Chip Seal - K148 Fr K148/K28 JCT E TO K148/US81 JCT in RP and JW Co. Lgth 22.50 MI.
Infrastructure
Results

University Park Water District and Lakeside Heights Utilities Extension No. 2
Infrastructure
Bidding
$270,000 CJ est. value
Manhattan, KS 66502

Chip Seal. k-68; Ka 6374-01; Fr k-33/k-68 Jct e 1.027 Mi to Fr/Mi Co Ln in Fr Co. Ka 6375-01; Fr Fr/Mi Co Ln 12.40 Mi e to u-169/k-68 Jct In Mi Co. Length 13.414 Mi.
Infrastructure
Results

Kimball Avenue North Campus Corridor Phase 9
Infrastructure
Results
Manhattan, KS 66502

Last Updated 08/15/2022 02:12 PM
Project Title

Runway 3/21 Reconstruction

Physical Address View project details and contacts
City, State (County) Manhattan, KS 66503   (Riley County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Runways/Taxiways, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $26,857,927 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Concrete Pavement (165,582 SY); Embankment in Place (116,816 CY); Crushed Aggregate Base Course (38,476 Tons); Stabilized Base (17,706 CY); Rubblization of Concrete (122,166 SY); Grooving (123,333 SY); Storm Sewers (2,576 LF); Underdrains (24,620 LF); Lighting; Signs; Navigational Aids; Marking (186,918 SF); and Seeding (92 AC) Questions regarding bids can be directed to Diane Hofer, P.E., consulting engineer at dhofer@olsson.com or 402.641.4468. These bids will be for the furnishing of all labor and materials, and performing all the Work in accordance with the drawings and specifications for: RUNWAY 3/21 RECONSTRUCTION AIP PROJECT NO. 3-20-0052-051/052/056 DCIP HQ00052110080 Contractors may inspect the project site only by an escorted on-site tour, which will be held following the pre-bid conference. Attendance at the tour is optional. Space is limited and participation per company may be restricted. Contractors MUST RESERVE a seat for this tour by calling Kim Boice at (785) 587-4597 no later than 4:00 p.m. local time on May 27, 2022.

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents