Similar Projects
Nestor Hall Auditorium Renovation
Renovation
Design
$5,116,856 est. value
Columbus, OH 43215

Parking Garage Upgrades
Renovation
Design
$4,000,000 est. value
Columbus, OH 43215

BGSU School of the Built Environment
New Construction, Addition - 29,400 SF
Bidding
$10,400,000 est. value

Parks - 3rd Floor Lab Renovations
Renovation, Infrastructure
Bidding
$3,613,164 est. value
Columbus, OH 43210

Envelope Renovation
Post-Bid
Less than $305,000 est. value
Columbus, OH

Blackwell - Pavilion Renovation
Post-Bid
Less than $2,000,000 est. value
Columbus, OH 43210

Parks - Room 145 Renovation
Renovation - 1,000 SF
Results
Less than $225,000 est. value
Columbus, OH 43210

Celeste -Room 36 Nexus Laser Renovation
Renovation - 1,400 SF
Results
Less than $1,516,103 est. value
Columbus, OH 43210

Commissioning Agent Services - Newton-Renovation and Addition
New Construction - 40,000 SF
Construction
$24,500,000 est. value
Columbus, OH

WOSU Headquarters and Studios
New Construction, Build-Out - 115,000 SF
Construction
$32,000,000 est. value
Columbus, OH 43201

Construction Manager at Risk for Library Book Depository Phase 3
Post-Bid
Less than $15,122,435 est. value
Columbus, OH

Suites 247 and 250 Renovation
Renovation - 9,404 SF
Results
Less than $1,250,000 est. value
Columbus, OH 43210

Chamberlain University College of Nursing
Renovation - 42,840 SF
Construction
$4,000,000 est. value
Columbus, OH 43219

Postle - Covid Barrier
Addition
Post-Bid
$2,673,000 est. value
Columbus, OH 43210

Martha Morehouse Facility Improvements
Renovation, Addition
Results
Columbus, OH 43210

Last Updated 08/30/2021 12:32 PM
Project Title

Ross Opr/Or Expansion

Physical Address View project details and contacts
City, State (County) Columbus, OH   (Franklin County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value $9,692,655
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project is situated within the Ross Heart Hospital and impactsoccupied areas on the 2nd, 4th, and 5thfloors(This building does not have a third floor). Thescope is based on a 10/21/19 study that identified a POR for 5,700 GSFofwork over three phases. The Staff lockers and breakroom will be moved from the 4thfloor to the 5thfloor roof to accommodate expansion of the existing PreOp/OPRon the 4thfloor. The project willalso addanewORon the roof of the 2ndfloor EP labs.The new OR will need to have adjacencies to the shared support services on the 4thfloor. The scope will include afullgut of each area and renovate with all new finishes and equipment. Significant consideration for Structuraland MEP will be assumed.Theprojectwill require phasing to accommodatethe existing functionsthat will occur during construction.

Details

College/University, Addition.
Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents