Similar Projects
Southwest Lift Station Construction
Renovation
Bidding
Provo, UT

1500 East Force Main Improvements Project
Renovation
Bidding
Vernal, UT

Autoliv AOA Pump House Addition
Addition - 425 SF
Post-Bid
Ogden, UT 84401

2019 Payson City Spring Lake Pump House Modifications
Post-Bid
Payson, UT 84651

Sewer Pump Station 1
Results
Less than $12,000,000 est. value
Salt Lake City, UT

Eaglewood Pump Station - NSL Project
Results
$500,000 to $1,000,000 est. value
North Salt Lake, UT 84054

Sandy City Well and Pump Station Maintenance Services (2020/21)
Post-Bid
Sandy, UT 84070

Construction of the Booster Pump Station
Results
Less than $55,000 est. value
Herriman, UT 84096

6200 South Zone C Pump Station
Term Contract
Post-Bid
West Jordan, UT 84081

SLC Airport Pumphouse Station #1
Results
Salt Lake City, UT 84122

Construction of the Walmart Lift Station
Post-Bid
Richfield, UT

Virgin River Pumphouse Renovation
Renovation
Results
$200,000 to $500,000 est. value
Saint George, UT

Stonebridge Maintenance Variable Speed Pump Station Replacement
Post-Bid
West Valley City, UT 84120

Sewer Lift Station Grinders
Results
Roy, UT 84067

Concrete Lined Pond and Pump Station
Post-Bid
Highland, UT 84003

Last Updated 02/22/2021 03:12 AM
Project Title

UDOT Hot Springs MS4 (Willard)

Physical Address View project details and contacts
City, State (County) Willard, UT 84340   (Box Elder County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Consists of the following: Demolition of existing pump house and mag tank. Construction of a new gravel road and pad behind the existing maintenance facility. Design and construction of a new evaporator building (see Division 13000 for Delegated Design requirements). Extending utility service to the new building including utility connections & fees. Addition of a waterway, inlet, catch basin, and storm drain piping & structures to route storm water runoff away from the existing pond. Installation and commissioning of various evaporation process components including evaporator, tanks, pumps, sensors, wet well, etc. Install connecting pipes from wet well to pond with stand pipe & apron. Various asphalt patches. Miscellaneous swales, channels & area drains.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents