Similar Projects
Sanitary Sewer Improvements 2019
Post-Bid
Less than $1,350,000 est. value
Carroll, OH

MRI/Sewer-Rehabilitation
Post-Bid
Less than $325,000 est. value
Cincinnati, OH 45221

Strivers/River Roads Sewer, Contract 4
Results
Less than $257,852 est. value
Aberdeen, OH

Group 2 Sanitary Sewer
Results
Bucyrus, OH

Campus Green Garage Sewer Lining
Post-Bid
Less than $350,000 est. value
Cincinnati, OH

Purdy Road Sanitary Sewer Extension
Results
Sardinia, OH

Emergency Repair Water and Sewer Line Services
Post-Bid
Niles, OH 44446

Midwest Materials Sanitary Sewer Improvements
Results
$640,000 est. value
North Perry, Perry, OH 44081

Scioto County - Interceptor Lining and Manhole Project
Post-Bid
Less than $1,824,700 est. value
Portsmouth, OH

Sunset Drive Area – Utility Improvements
Results
$350,000 est. value
Bay Village, OH

Spring Grove Sewer Replacement
Post-Bid
Less than $455,100 est. value
Cincinnati, OH 45204

WWTP Collection Improvements - Nelsonville City
Results
Less than $870,000 est. value
Nelsonville, OH 45764

Lock 9 Park Utility Project
Results
Less than $581,247 est. value
Piqua, OH 45356

Third Street Sanitary Sewer Extension
Results
Less than $76,415 est. value
Delphos, OH 45833

Sanitary Sewer Lining
Results
Middletown, OH 45042

Reported 09/15/2020 12:00 AM
Project Title

2021 Sewer Pump Outs

Physical Address View project details and contacts
City, State (County) Clarksfield, OH 44889   (Huron County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

To pump out a minimum of 14,000 gallons per day and price should be submitted on a per gallon basis for residential pump outs. Separate bid items should also be provided, on a per gallon basis, for Emergency pump-outs as well as for commercial and car wash establishment pump outs. Pump-outs should start on or about March 1st and be completed by June 1st. Contractor must be able to remove and securely replace septic tank lids and provide the Village with a septage pumping report for each tank pumped. The cost per gallon bid for each pump out item will need to include the cost of any necessary permitting and/or testing that may be associated with pumping and/or disposal of the waste material removed.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents