Similar Projects
Longmont Fire Station 2 and 6
Renovation
Design
Longmont, CO 80501

New Loveland Fire Rescue Authority Station 10
New Construction - 15,500 SF
Bidding
Johnstown, Loveland, CO

Fire Station Headquarters
New Construction - 18,544 SF
Bidding
Less than $8,000,000 est. value
Canon City, CO 81212

New Fire Barn No. 2
Post-Bid
Less than $3,000,000 est. value
Boulder, CO 80304

Fire Station #4 Renovation
Post-Bid
Poncha Springs, CO 81242

Detention Center Main Kitchen & Staff Dining Remodel
Results
Less than $200,000 est. value
Brighton, CO 80601

Police Station 2nd Floor Renovation
Renovation
Results
Black Hawk, CO 80422

New Fire Station
Construction
Falcon, CO 80831

Design and Construction of Training Tower
Construction
Less than $1,500,000 est. value
Durango, CO 81301

Falcon Fire Department Admin Building Addition And Remodel
Renovation, Addition
Bidding
Peyton, CO 80831

Delta County Sheriffs Office Rifle Range Construction
Post-Bid
Delta, CO 81416

Downtown Fire Station Site
Results
Steamboat Springs, CO

Station 2 Construction Project
New Construction - 10,650 SF
Construction
Eaton, CO 80615

Fire Station 3 CM/GC Services
New Construction - 30,000 SF
Bidding
$18,000,000 est. value
Boulder, CO 80301

Addition for existing four bay Station 5
Addition
Post-Bid
Less than $800,000 est. value
Ignacio, CO

Last Updated 07/07/2021 10:45 AM
Project Title

Denver Fire Stations 12, 16, 22, and 25 Renovations

Physical Address View project details and contacts
City, State (County) Denver, CO   (Adams County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method
Project Status Construction Commenced July 2021, No Sub Bids Needed
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Work: Fire Station 12: (2575 Federal Boulevard Denver, CO 80211) Gender Equity and Restroom renovation. Provide one ADA restroom off the Apparatus Bay, and two additional restrooms on the main crew existing restroom, per the drawings dated 10/8/2020 by Ratio/Humphries Poli Architects. Fire Station 16: (1601 S. Ogden St. Denver, CO 80210) Restroom renovation. Provide one ADA restroom off the Apparatus Bay, and two additional restrooms on the main crew existing restroom. This is to replace the existing open restroom layout. Kitchen renovation. Like for like replacement of the: cabinets and countertops, polished flooring, reuse appliances, per the drawings dated 10/8/2020 by Ratio/Humphries Poli Architects. Fire Station 22: (3530 S. Monaco Parkway Denver, CO 80237) Restroom renovation. Provide one ADA restroom off the bay, and then two additional restrooms on the main crew existing restroom. This is to replace the existing open restroom layout, per the drawings dated 10/8/2020 by Ratio/Humphries Poli Architects. Fire Station 25: (2504 S. Raleigh Street Denver, CO 80219) Apparatus Bay floor. The current Apparatus Bay floor is failing and needs to be redesigned or Improved per the design team recommendation. This project is to have the main north bay be the first priority of the scope, with the south bay design as an alternate for construction, per the drawings dated 10/8/2020 by Ratio/Humphries Poli Architects.

Details

Fire/Police Station, Renovation.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents