Similar Projects
Last Updated | 08/04/2022 03:07 PM |
Project Title | 2022 Sanitary System Improvements Pump Station Rehabilitation |
Physical Address | View project details and contacts |
City, State (County) | East China, MI 48054 (Saint Clair County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Lift and Pump Stations, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Construction start expected August 2022 |
Bids Due | View project details and contacts |
Estimated Value | $853,051 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | **As of August 4 2022, the project has not yet been awarded. A timeline for award has not yet been established.** Pump Station H & B: Provide and replace new pumps, gate valves, and check valves within the dry well. Provide and install new control cabinet and pump controls for relocation outside of dry well. Pump Station P: Provide and replace pipework, check and gate valves within station's wet well. Raise wet well with reinforced concrete riser, block and concrete foundation. Upgrade power service to 200 AMP through DTE. Provide and install new control cabinet and pump controls. Provide and replace level sensor probes. Together with traffic control and other related work items Buyers Requirements General Requirements - Bid Deposit Required Bonding Requirements - Bid Bond 5 % |
||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |