Similar Projects
Septage Holding Tanks Replacement Project
Infrastructure
Bidding
$300,000 CJ est. value
Smiths Creek, MI 48074

Port Huron Armory - Construct Addition
Addition, Demolition, Renovation, Infrastructure
Bidding
$2,900,000 CJ est. value
Port Huron, MI 48060

Septage Forcemain Valve Station Project
New Construction
Post-Bid
$5,000,000 est. value
Smiths Creek, MI 48074

Buckland Industries
Infrastructure
Post-Bid
$3,927,000 est. value
Port Huron, MI 48060

Robbins Street Road And Water Main Replacement
Results
Algonac, MI

LDFA Site Clearing
Results
Port Huron, MI

RFP Construction Manager - Construction / Renovation of the PIHP Building
New Construction, Renovation, Infrastructure
Bidding
$6,500,000 CJ est. value
Port Huron, MI 48060

Cells 2/3/4 East Sideslope Seeding Project
Infrastructure
Post-Bid
$240,000 CJ est. value
Smiths Creek, MI 48074

Share Street Reconstruction & Watermain Replacement 2021
Results
Saint Clair, MI

Bridge Rehabilitation Including Hydraulic Cylinder and Tail Lock and Concrete Patching M-29
Infrastructure
Bidding
$1,455,000 CJ est. value
Saint Clair, MI 48079

Griswold Street/I-69 BL W
Infrastructure
Post-Bid
$400,000 CJ est. value
Port Huron, MI 48060

Dorion Avenue Reconstruction & Watermain Replacement 2021
Results
Saint Clair, MI

M-29 Drainage project
Infrastructure
Bidding
$223,950 CJ est. value
Ira, MI 48023

M-136 Culvert Replacement Project for Tributary to Brandymore Drain
Infrastructure
Post-Bid
$330,000 CJ est. value
Fort Gratiot, MI 48059

North Channel BAS - Site Improvements
Results
Algonac, Clay Township, MI 48001

Last Updated 08/04/2022 03:07 PM
Project Title

2022 Sanitary System Improvements Pump Station Rehabilitation

Physical Address View project details and contacts
City, State (County) East China, MI 48054   (Saint Clair County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $853,051 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

**As of August 4 2022, the project has not yet been awarded. A timeline for award has not yet been established.** Pump Station H & B: Provide and replace new pumps, gate valves, and check valves within the dry well. Provide and install new control cabinet and pump controls for relocation outside of dry well. Pump Station P: Provide and replace pipework, check and gate valves within station's wet well. Raise wet well with reinforced concrete riser, block and concrete foundation. Upgrade power service to 200 AMP through DTE. Provide and install new control cabinet and pump controls. Provide and replace level sensor probes. Together with traffic control and other related work items Buyers Requirements General Requirements - Bid Deposit Required Bonding Requirements - Bid Bond 5 %

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents