Similar Projects
Replacement Heaters at the Water Treatment Plant
Bidding
Harbor Beach, MI 48441

Replacement Boilers - Chippewa Hills School District
Bidding
Remus, MI 49340

Storm Water Mechanical and Electrical Systems Replacement Project
Post-Bid
Harrison Township, MI 48045

Construction Work for an Energy Performance Contract for Electric/Plumbing/ Mechanical/Build/Appliances
Post-Bid
Saint Joseph, MI 49085

Boiler Replacement for Columbiaville Elementary
Results
Less than $173,250 est. value
Columbiaville, MI 48463

Boiler Controls Upgrade
Results
Dollar Bay, MI 499220350

Boiler Replacements
Bidding
Munising, MI

Mechanical Improvement Projects Services
Post-Bid
Grand Rapids, MI

East McNair Steam Trap Replacement
Results
Less than $185,849 est. value
Houghton, MI 49931

Pump Station Maintenance Program
Bidding
Southfield, MI

Boiler Pre-Pricing Package
Post-Bid
Walled Lake, MI

Replace Bldg. 570 Boiler "Mulligans"
Results
$25,000 to $100,000 est. value
Harrison Township, MI 48045

2021 Mechanical System Improvements
Bidding
Coopersville, MI

Stevenson High School Mechanical Upgrades
Post-Bid
Sterling Heights, MI

DNR Escanaba Field Office Boiler Replacement
Results
Less than $83,955 est. value
Gladstone, MI

Reported 11/21/2020 12:00 AM
Project Title

Domestic Hot Water Replacement and Boiler Replacement

Physical Address View project details and contacts
City, State (County) Paw Paw, MI 49079   (Van Buren County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Remove 3 existing, non-functioning Kelly Patterson boilers and old hot water heater and haul away to an approved landfill Install 2 new Lochinvar Power-Fin Boilers 2 new Lochinvar Power-Fin boilers M#PBN2001-M13 with 5:1 turndown 2 new Lochinvar boiler circulation pumps M#ARM3099PBF Labor to install Material to install-pipe, pipe fitting, venting (Heat-fab CI Plus) gas regulators All rigging and welding Coordinate with Brett Doornhaag, Head of Maintenance for staging and work hours See attached specification sheet for the Lochinvar Power Fin Boiler Domestic Hot Water Replacement 2 new Lochinvar Square Indirect Water Heaters M#SIT 119 1 new hot water circulation pump-Grundfos M#UPS43-100F Hot water mixing valve(s) Watts M# LFMMVM1-US Labor to install Material to install Rigging

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Heating Boilers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents