Similar Projects
Public Works Building Renovation
Renovation
Bidding
Canton, GA 30114

Big Shanty Elementary School Interior Exterior Painting
Alteration
Bidding
Kennesaw, GA 30144

Aquatic Center Painting
Post-Bid
Augusta, GA 30900

Painting of Water Tanks
Post-Bid
Port Wentworth, GA 28303

Z--Prep/Paint Exterior of Bldg-St Marys, GA
Results
$100,000 to $250,000 est. value
Saint Marys, GA 31558

Atrium Painting for Fulton County Government
Results
Atlanta, GA 30303

Blackwell Elementary School Interior Exterior Painting
Alteration
Bidding
Marietta, GA 30066

Repainting of Burt's Crossing Elevated Tank
Post-Bid
Dawsonville, GA 30534

Aircraft Static Display Painting
Results
Garden City, GA 31408

GCSU Summer Turnover for West Campus Residence Halls
Alteration
Bidding
Milledgeville, GA 31061

Painting the Cafeteria at the Richmond Hill Community Education Building
Post-Bid
Richmond Hill, GA 31324

2021 Coatings Program
Results
Less than $348,470 est. value
Acworth, Marietta, GA 30101

Painting Services
Alteration
Bidding
Macon, GA 31216

Painting Exterior Of City Hall Annex
Post-Bid
Valdosta, GA

Interior Renovations for Berrien High School
Results
Nashville, GA 31639

Reported 03/01/2022 12:00 AM
Project Title

Painting and Pressure Washing at Select Schools

Physical Address View project details and contacts
City, State (County) Covington, Mansfield, GA 30014   (Newton County)
Category(s) Single Trades
Sub-Category(s) Painting
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor for necessary cleaning, preparation and painting services at select school facilities. This work should include all necessary equipment, materials and labor to complete the work as listed below. Interior/Exterior Painting: 1. Repainting school building (interior & exterior) as shown on attached drawings. (Note: Mansfield Elementary School will only have interior hallways and group bathrooms painted. All interior and exterior metal door, door frames and door window frames will be painted on both sides.) 2. Repaint all canopy columns and trusses 3. All painting shall be brushed and rolled with two coats. No paint spraying equipment will be allowed. 4. Caulking around all openings in building (windows and doors) where caulk is missing and/or needs to be replaced. 5. Painting all hollow metal door, window and mechanical louver frames (interior and exterior – both sides of frames) 6. Removal of loose window caulking at all windows (interior and exterior, as required) 7. Caulk all openings where expansion shields, picture hangers or penetrating items have been removed. 8. Paint all doors (interior & exterior) except prefinished hardwood doors. 9. Rope and caulk all control and expansion joints on interior of building 10. Caulk around perimeter of all door, window openings, (interior & exterior locations– both sides) as required to seal openings 11. Caulk all expansion joints as needed 12. Painting underside of soffit area overhangs if applicable 13. Paint both sides of all hollow metal doors and frames (interior and exterior) 14. Paint all hollow metal handrails and guardrails, if applicable 15. Paint all previously painted concrete block and gypsum board walls, EFIS, bulkheads and ceilings. 16. First coat of paint shall be two shades darker than final coat. Pressure Washing: 1. Pressure wash all exterior surfaces on building (excluding roof). 2. Pressure wash all canopies, frames and columns. 3. Pressure wash all sidewalks as indicated on drawings.

Details

Division 09 - Finishes, Painting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents