Similar Projects
North Shore Terminal Reservoir Phase 2 Expansion Project
Renovation
Design
Orem, UT

Automated Brine Maker System With Vertical Storage Tanks
Post-Bid
Orem, UT 84057

Concrete Lined Pond and Pump Station
Post-Bid
Highland, UT 84003

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

World-Wide Water Storage Tank Remediation
Term Contract
Results

Public Works SCADA System Upgrade 2021
Post-Bid
$385,000 est. value
Lindon, UT

Elk Ridge Oak Lane Booster Pump Station
Results
Less than $500,000 est. value
Elk Ridge, UT 84651

Santaquin Zone 11W Tank and Booster Pump CM/GC
New Construction
Post-Bid
Santaquin, UT 84655

Construction Services for Sand Pit and 600 East Culinary Water Tanks
Results
Less than $342,244 est. value
Lehi, UT 84043

SW Regional Lift Station
Results
Spanish Fork, UT

Industrial Sewer and Lift Station Abandonment
Results
Less than $1,811,150 est. value
Provo, UT

Zone 1 4-Mg Water Tank At Airport Site
Results

Southwest Lift Station
Results
Provo, UT

Upper Spring Creek Tank Rehabilitation Part 2
Results
Springville, UT

Southwest Lift Station Construction
Renovation
Results
Provo, UT

Reported 10/07/2021 12:00 AM
Project Title

Vineyard 6 MG Tank and Booster Pump Station Project

Physical Address View project details and contacts
City, State (County) Vineyard, UT   (Utah County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Work of this Contract includes the construction of a 6 MG post-tensioned concrete water storage tank with associated piping and valve vaults, construction of a booster pump station with vertical turbine pumps and associated suction and discharge pipes, electrical including emergency standby generators, HVAC, site drains, sanitary sewer pipeline, and final site grading. The project is located 282 West 1600 North in Vineyard City, Utah.

Details

Lift and Pump Stations, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents