Similar Projects
2021 High Density Mineral Bond
Bidding
South Jordan, UT 84095

SR-71 Hillcrest High Drive to 3300 South Preservation High Volume
Bidding
$1,500,000 to $3,000,000 est. value
Midvale, UT 84047

US-89; I-215 to 4300 South Preservation High Volume
Post-Bid
$3,000,000 to $4,000,000 est. value
UT

3200 West; 10431 South to 10600 South Reconstruct Widening
Post-Bid
$500,000 to $1,500,000 est. value
UT

Redwood Road 4100 South to 5400 South
Results

2019 Roadway Improvement Projects
Results
Midvale, UT

2021 Pavement Maintenance Project
Bidding
Draper, UT

UDOT Culvert Cleaning and Video Contract
Term Contract
Post-Bid

1700 South, 600 East Bike Lane, School Crosswalk Enhancements
Results
Less than $84,895 est. value
Salt Lake City, UT 84111

13200 South Pavement Reconstruction
Bidding
Less than $200,000 est. value
Draper, UT

Jupiter and Brockbank Roadway Improvements
Post-Bid
Millcreek, UT 84106

Dry Creek Improvements
Results
Less than $1,000,000 est. value
Sandy, UT

I-15 at 400 S and 600 N; SR-89 at NB I-15
Bidding
$3,000,000 to $4,000,000 est. value
UT

Parleys Way Crosswalk Enhancements and Pedestrian Safety Improvements
Post-Bid
Salt Lake City, UT 84114

2019 Fall Crack Seal Project
Results
Sandy, UT 84070

Last Updated 02/18/2021 05:01 PM
Project Title

Local Strees Reconstruction 2021 #1

Physical Address View project details and contacts
City, State (County) Salt Lake City, UT   (Salt Lake County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $2,383,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be performed consists of furnishing and installing the equipment, facilities, services, and appurtenances indicated in the Contract Documents. The Work generally includes, but is not limited to, the following: street improvements (i.e. replacement of concrete flatwork, ADA ramps, and C&G; replacement of pavement and reclaimed aggregate with cement stabilizer), storm drainage upgrades and water system upgrades. The location of the work is: 200 North from 400 West to the concrete pavement, Alta Street from 2nd Avenue to Federal Heights Drive, Cambridge Circle from Cambridge Way to north terminus, Cambridge Way from Perry’s Hollow Road to Tomahawk Drive, L Street from 7th Avenue to 8th Avenue, L Street from 9th Avenue to 10th Avenue, M Street from 3rd Avenue to 4th Avenue and Wall Street from Columbus Street to 400 North in Salt lake City.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents