Similar Projects
Wisdom Academy Phase I
New Construction - 12,600 SF
Design
$1,000,000 est. value
Carrollton, TX 75006

Career Institute North at Walnut Hill
New Construction
Sub-Bidding
Less than $2,000,000 est. value
Dallas, TX 75229

Brentfield Elementary Additions and Renovations
Renovation, Addition
Sub-Bidding
TX 75248

McWhorter Elementary School Maintenance Package
Renovation
Post-Bid
Dallas, TX 75287

Cannaday Elementary School Addition
Addition
Post-Bid
Mesquite, TX

Jill Stone Elementary School
New Construction
Results
Less than $27,634,000 est. value
Dallas, TX 75231

Nathaniel Hawthorne Elementary School New Construction
New Construction
Results
$26,500,000 est. value
Dallas, TX 75217

Wilmer Elementary School - New
New Construction - 83,720 SF
Construction
$22,745,620 est. value
Wilmer, TX 75172

Alex Sanger Elementary School Classroom Addition and Renovation
Renovation, Addition
Construction
$14,456,710 est. value
Dallas, TX 75218

Job Order Contracting Services Districtwide
Renovation
Post-Bid
Dallas, TX 75219

Lorenzo DeZavala Elementary School Renovations
Renovation
Results
$3,176,097 est. value
Dallas, TX 75212

Steamspark Montessori School
New Construction - 13,000 SF
Construction
$2,000,000 est. value
Farmers Branch, TX 75234

Whitt Elementary Bus Loop Drive Expansion
Post-Bid
Sachse, TX 75048

Nathan Adams Elementary School - Renovation
Renovation
Results
$4,416,600 est. value
Dallas, TX 75244

Golden Rule Charter School Campus Improvements
Addition
Construction
$6,500,000 est. value
DeSoto, TX 75115

Last Updated 12/16/2020 10:06 AM
Project Title

Mount Auburn Elementary Renovation

Physical Address View project details and contacts
City, State (County) Dallas, TX 75223   (Dallas County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $4,142,641
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Front entry enhancement involving landscaping, paving, benches, signage, and small steel entry structure frame 2. Pressure washing CMU and cast stone on 1987 wing 3. Downspouts and drainage infrastructure replacement along the front of the building and in a couple of internal courtyards 4. Pavement replacement 5. Exterior lighting and pole replacement 6. Interior lighting replacement 7. Lay in ceiling and grid replacement 8. Interior and exterior painting 9. Flooring replacement 10. Replacement of a few doors and transom windows 11. Development of a secured entry vestibule and front office modification 12. Grease line replacement from kitchen to grease trap 13. Sewer line replacement over one classroom 14. Installation of a kiln room and required exhaust 15. Replacement of select HVAC split systems and exhaust fans Dallas ISD Construction Services CSP E188_P0015_3 00 11 13 Page 2 of 3 June 28, 2020 Revised 4/2/2020 16. Replacement of VAV boxes and DDC controls 17. Replacement of fire alarm 18. Abatement of hazardous materials in the existing building

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents